Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-1090-LEP
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Probe Calibration
Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Probe Removal and Replacement
Remove the 'To Process' temperature probe and insert a 1/2" plug in its place.
Ice Water Bath Preparation
Prepare an ice water bath.
Record the temperature of the ice water bath using an accurate digital thermometer.
Calibration Procedure
Electronic Instrument Maintenance
In Warranty Service Incident
Call the factory for diagnostic assistance
Was the control instrument determined to be at fault?
Send a new or reconditioned instrument as a replacement
Return the defective instrument freight pre-paid for full credit
Was the defective instrument returned?
Pay for the instrument if not returned
Out of Warranty Service Incident
Call the factory for diagnostic assistance
Sensor Probe Maintenance
Reconnection
Unplug the sensor probe connection
Shake out water from the service connection
Replug the sensor probe connection
Did the error display change to Solid Red?
Press the Start push button to clear the error display
Replacement
Cease process operations as outlined in section 3.4 of the manual
Is all process pressure relieved and do the unit's pressure gauges read '0'?
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in this manual
Ensure proper lock-out procedures are followed
Ensure system pressure is eliminated and the unit's pressure gauges read '0' pressure
Pressure Switch Removal
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Instrument Controller Maintenance
Preparation
Disengage process operations according to section 3.4
Verify all system pressure is relieved and pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Panel and Instrument Removal
Remove the thermoformed front panel and set aside
Open the hinged electrical cabinet panel cover
Remove the large molex connector
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX