Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-1690-LEP
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heating Cylinder Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify that the unit's pressure gauges read "0"
Disengage main power supply
Verify the Power light on the display is "off"
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Removal
Pump Seal Replacement
Preparation
Disengage process operations and relieve all system pressure
Disengage main power supply and verify the Power light on the display is 'off'
Access Panel Removal
Remove the lift-off access panel and set aside
Remove the thermoformed panel attached by 4 small screws
Drain and Disconnect
Drain machine by removing the pump casing drain plug
Remove the three motor wire leads from the motor wiring terminals and map the wire terminal locations
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in the manual
Ensure proper lock-out procedures are followed
Ensure system pressure is eliminated and unit's pressure gauges read '0' pressure
Pressure Switch Removal
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Volatge Change
Pre-Conversion Consultation
Consult with the Advantage Service Department to determine if your unit can be converted. Have your Serial Number ready and call 317-887-0729.
Typical Conversions
Select the conversion type
Consult factory for other power conversions
Items Requiring Replacement or Rewiring
Check items for replacement or rewiring
Field Voltage Changeover Procedure
Disengage operations and verify all system pressure is relieved and the unit’s pressure gauges read '0'.
Cooling Valve Maintenance
Initial Safety and Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Access and Disassembly
Remove the lift-off access panel and set aside.
Disconnect the valve wiring harness.
Remove the AVT valve's drip cover.
Motor Driver/Gearbox Servicing
Remove the 2 mounting screws securing the motor/gearbox assembly to the valve bracket.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX