MaintainX, an Autodesk company
EnterprisePricing
Mori Seiki

Mori Seiki CNC Turning Center NL2500S/1250

Need answers fast?
Explore the manual using AI.

Mori Seiki CNC Turning Center NL2500S/1250
Mori Seiki CNC Turning Center NL2500S/1250

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mori Seiki CNC Turning Center NL2500S/1250

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mori Seiki CNC Turning Center NL2500S/1250

Mori Seiki CNC Turning Center NL2500S/1250

Create an account to install this asset package.

Maintenance Plans for Mori Seiki CNC Turning Center Model NL2500S/1250

Integrate maintenance plans directly into your work orders in MaintainX.

Spindle Drain Hole Cleaning

Check mark

Safety Precautions

Check mark

Turn OFF the main power and disconnect the plant-side power supply (breaker).

Check mark

Do not use compressed air.

Check mark

Wear protective gloves when handling chips.

Check mark

Cleaning Spindle Drain Hole

Check mark

Remove the cover of the spindle drain hole.

Check mark

Check and clean the drain holes if clogged

Check mark

Cleaning Tailstock Spindle Drain Hole (Built-in Type)

Check mark

Remove chips and dust from the cover with a rag.

Run this procedureArrow right

Coolant Replenishing

Check mark

Precautions when Selecting Coolant

Check mark

Ensure non-flammable coolant is used unless unavoidable

Check mark

Is automatic fire extinguishing equipment installed if using flammable coolant?

Check mark

Is the coolant cooling unit installed if using flammable coolant?

Check mark

Receive MSDS from coolant manufacturer

Check mark

Ensure coolant satisfies the following conditions

Check mark

Using Water-Soluble Coolant

Check mark

Add diluted coolant mixture to coolant tank after mixing in a separate container

Check mark

Use coolant at the concentration specified by the supplier

Run this procedureArrow right

Initial 2 Months Chip Conveyor Belt Adjustment

Check mark

Preparation

Check mark

Turn OFF the main power

Check mark

Disassembly

Check mark

Remove the drive cover

Check mark

Remove the parts A

Check mark

Belt Adjustment

Check mark

Loosen the lock nut

Check mark

Adjust the tension in the belt by rotating the adjusting bolt

Check mark

Tighten the lock nut to secure the adjusting bolt

Run this procedureArrow right

1 Yearly Chip Conveyor Belt Adjustment

Check mark

Preparation

Check mark

Turn OFF the main power

Check mark

Disassembly

Check mark

Remove the drive cover

Check mark

Remove the parts A

Check mark

Adjustment

Check mark

Loosen the lock nut

Check mark

Adjust the tension in the belt by rotating the adjusting bolt

Check mark

Tighten the lock nut to secure the adjusting bolt

Run this procedureArrow right

Initial 150 Hours V-Belt Inspection

Check mark

Pre-Inspection Safety Measures

Check mark

Read and understand the operation manual for the high pressure coolant unit.

Check mark

Ensure the operation manual is on hand for immediate reference.

Check mark

High Pressure Pump Oil Replacement and V-Belt Inspection

Check mark

Turn OFF the main power before removing the rear cover.

Check mark

Remove the rear cover.

Check mark

Inspect the V-belt for the following issues

Check mark

Is V-belt adjustment necessary?

Check mark

Adjust the V-belt tension if necessary.

Run this procedureArrow right

Parts for Mori Seiki CNC Turning Center NL2500S/1250

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Oil Tank 10 L

U00531A

Manifold BT-202-50-S

U00536A

Manifold BT-102-50-S (UK4619)

U00537A

Manifold BT-102-50-S (UK4273-1)

U00532A

Manifold BT-202-50-S (UK4276-1)

U00530B

Oil Tank 10 L

U00531A

Manifold BT-202-50-S

U00536A

Manifold BT-102-50-S (UK4619)

U00537A

Manifold BT-102-50-S (UK4273-1)

U00532A

Manifold BT-202-50-S (UK4276-1)

U00530B

Oil Tank 10 L

U00531A

Manifold BT-202-50-S

U00536A

Manifold BT-102-50-S (UK4619)

U00537A

Manifold BT-102-50-S (UK4273-1)

U00532A

Manifold BT-202-50-S (UK4276-1)

U00530B

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mori Seiki

Explore Other Assets