

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

MAC Automation Concepts Conveyor LF-6-12
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Conveyor Inspection
Routine Inspection
Ensure all safety features and devices are functioning properly
Check motors, reducers, and all moving parts
Are all moving parts working properly and freely?
Belt and Pulley Inspection
Check for any foreign objects on the conveyor belt
Inspect for build-up on pulleys
Check for material accumulation affecting belt tracking
Cleaning Procedure
Initial Belt Tracking Check
Initial Power Up
Power up the conveyor
Is the belt moving smoothly without any unusual noises?
Belt Monitoring
Is the belt remaining centered on the pulleys?
Check for any signs of loosening during shipment
Final Checks
Is the belt tracking correctly after initial power up?
Describe any issues observed during the initial belt tracking check
Belt Replacement
Preparation
Gather all required tools: rubber mallet, two 9/16 wrenches, 7/32 hex key, 5/32 hex key, 1/8 hex key, belt tension tool
Disconnect all power from conveyor
Belt Removal
Loosen both casting bolts using 7/32 hex key
Release tension on belt using belt tension tool
Remove left eccentric collar using a 1/8 hex key
Remove two 1/4-20 B.H.C.S. from splice assembly using 5/32 hex key
Remove splice assembly by gently tapping with rubber mallet in direction of arrow
Routine Belt Tracking Check
Belt Inspection
Inspect if the belt is tracking centred on the pulleys
Adjustment Procedure
Is the belt tracking off centre at the idle pulley?
Adjust the belt tension
Did you increase tension on one side?
Did you decrease tension on one side?
Ensure the belt is not over-tensioned
4 Weekly Chain Sprocket Lubrication
Preparation
Ensure the conveyor is turned off and locked out
Gather necessary tools and materials
Lubrication Process
Identify parts to lubricate
Apply quality chain lubricant to the chain
Apply quality chain lubricant to the sprockets
Post-Lubrication Check
Is the lubrication evenly applied across all parts?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













