

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

MAC Automation Concepts Conveyor LF-10-12
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 250 Hours Gear Reducer Oil Change
Preparation
Ensure the conveyor is turned off and locked out
Gather necessary tools and materials (e.g., Mobil 600W lubricant, wrenches, oil pan)
Oil Drainage
Place an oil pan under the gear reducer
Remove the drain plug and allow old oil to completely drain out
Oil Replacement
Reinstall the drain plug securely
Fill the gear reducer with Mobil 600W lubricant to the recommended level
2500 Hourly / 6 Monthly Gear Reducer Oil Change
Preparation
Ensure the conveyor is turned off and locked out
Gather necessary tools and materials (e.g., Mobil 600W lubricant, wrenches, oil pan)
Oil Drainage
Place an oil pan under the gear reducer
Remove the drain plug and allow old oil to completely drain out
Oil Replacement
Reinstall the drain plug securely
Fill the gear reducer with Mobil 600W lubricant to the recommended level
Initial Integral Gear Motor Inspection
Motor Type Confirmation
Confirm motor type at commissioning
Lubrication Check
Ensure no external lubrication is applied
General Information
Applicable to conveyors equipped with an Integral Gear Motor
Initial Belt Maintenance
Square up drive pulley with frame
Install belt according to assembly instructions guide
Centre the belt on the idle pulley
Tighten up the idle pulley and maintain belt centre
Turn on power
If belt tracks off centre of idle pulley, tighten the take-up on the side the belt is running toward as shown in the belt tracking diagram
Post installation check
Verify belt alignment
Check for any unusual noises
4 Weekly Chain Sprocket Lubrication
Chain Sprocket Lubrication Procedure
Preparation
Ensure the conveyor is turned off and locked out
Gather necessary tools and materials
Lubrication Process
Inspect the chain and sprockets for wear and damage
Clean the chain and sprockets
Apply lubricant to the chain and sprockets
Post-Lubrication
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













