

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

MAC Automation Concepts Conveyor LF-3-6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 250 Hours Gear Reducer Oil Change
Preparation
Ensure the conveyor is turned off and locked out
Gather necessary tools and materials (e.g., Mobil 600W lubricant, wrenches, oil pan)
Oil Drainage
Place an oil pan under the gear reducer
Remove the oil drain plug and allow the old oil to completely drain out
Oil Replacement
Reinstall the oil drain plug securely
Fill the gear reducer with Mobil 600W lubricant to the specified level
Belt Replacement
Disconnect all power from conveyor
Loosen both casting bolts
Release tension on belt
Remove left eccentric collar
Remove two 1/4-20 B.H.C.S. from splice assembly
Remove splice assembly
Remove two motor mount bolts
Remove right side rail or right side conveyor cover
Unbolt variable speed control if applicable
2500 Hourly / 6 Monthly Gear Reducer Oil Change
Preparation
Ensure the conveyor is turned off and locked out for safety
Gather necessary tools and materials, including Mobil 600W lubricant
Oil Drainage
Place a suitable container under the gear reducer to catch old oil
Remove the drain plug and allow the old oil to completely drain out
Oil Replacement
Inspect the drain plug and replace it if necessary
Reinstall the drain plug securely
Initial Integral Gear Motor Inspection
Motor Type Confirmation
Confirm motor type at commissioning
Lubrication Check
Ensure no external lubrication is applied
General Inspection
Verify the following components are in place and secure
Conveyor Inspection
Routine Inspection
Ensure conveyor is running to specifications
Check all safety features and devices
Inspect motors, reducers, and all moving parts
Belt and Pulley Inspection
Check for foreign objects on the conveyor
Inspect for build-up on pulleys
Check for material accumulation affecting belt tracking
Cleaning Procedures
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













