Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lochinvar Boiler WHB155N
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Fill Water Meter Check
Safety Precautions
Ensure the boiler is not frozen
Turn off power to the boiler
Check Fill Water Meter
Enter the current water usage from the fill water meter
Is the water usage within 5% of the system volume?
Leak Inspection
Have the system checked for leaks by a qualified service technician if water usage exceeds 5%
Annual Inspection
Heat Exchanger Cleaning
Safety Precautions
Ensure boiler is not frozen
Shut off power and gas to the appliance if frozen
Contact the factory for further instructions if frozen
Turn off power to the boiler before any service operation
Shut Down Boiler
Follow the 'To Turn Off Gas to Appliance' instructions
Do not drain the boiler unless exposed to freezing temperatures
Cooling and Access
Ignition Ground Wiring Check
Inspect boiler ground wire from the heat exchanger access cover to ground terminal strip
Verify all wiring is in good condition and securely attached
Check ground continuity of wiring using continuity meter
Replace ground wires if ground continuity is not satisfactory
Safety Precautions
Ensure boiler is not frozen before proceeding
Turn off power to the boiler before any service operation
Set Point Temperature Adjustment
Notice
Press the NAVIGATION dial from the Status Screen
Turn the NAVIGATION dial counterclockwise to select the appropriate set point
Press the NAVIGATION dial to adjust the temperature
Press the RIGHT SELECT [SAVE] key once the desired temperature is displayed
Repeat Steps 3 and 4 if necessary to adjust additional set points
Press the RIGHT SELECT [HOME] key to upload the changes
If the RIGHT SELECT [SAVE] key is not pressed, the new settings will be discarded
1 Monthly Condensate Trap Inspection
Safety Precautions
Shut off power and gas to the appliance if the boiler may be frozen.
Ensure the boiler is not frozen before proceeding with inspection.
Turn off power to the boiler before any service operation.
Condensate System Inspection
Inspect the condensate trap for proper installation and connection to the condensate pipe under the boiler.
Inspect the condensate line for obstructions to ensure free flow for condensate to drain.
Inspect the neutralizing kit (if installed) to ensure proper drainage and adequate neutralizing agent availability.
Post Inspection
Access the parts list for your equipment in MaintainX.
Vent Kit, Lochinvar, 2 Inch
100157609
Vent Kit, Lochinvar, 3 Inch
100157610
Vent Kit, Lochinvar, 4 Inch
100157611
Vent Kit, Centrotherm, 2 Inch
ISLPT0202
Vent Kit, Centrotherm, 3 Inch
ISLPT0303
Vent Kit, Lochinvar, 2 Inch
100157609
Vent Kit, Lochinvar, 3 Inch
100157610
Vent Kit, Lochinvar, 4 Inch
100157611
Vent Kit, Centrotherm, 2 Inch
ISLPT0202
Vent Kit, Centrotherm, 3 Inch
ISLPT0303
Vent Kit, Lochinvar, 2 Inch
100157609
Vent Kit, Lochinvar, 3 Inch
100157610
Vent Kit, Lochinvar, 4 Inch
100157611
Vent Kit, Centrotherm, 2 Inch
ISLPT0202
Vent Kit, Centrotherm, 3 Inch
ISLPT0303
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX