MaintainX, an Autodesk company
EnterprisePricing
Lochinvar

Lochinvar Boiler WHB199N

Need answers fast?
Explore the manual using AI.

Lochinvar Boiler WHB199N
Lochinvar Boiler WHB199N

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Lochinvar Boiler WHB199N

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lochinvar Boiler WHB199N

Lochinvar Boiler WHB199N

Create an account to install this asset package.

Maintenance Plans for Lochinvar Boiler Model WHB199N

Integrate maintenance plans directly into your work orders in MaintainX.

Water System Testing

Check mark

Ensure water meets manual requirements before filling the system

Check mark

Close automatic and manual air vents and boiler drain valve

Check mark

Fill to correct system pressure

Check mark

Enter the minimum cold water fill pressure

Check mark

Check if the pressure rises when the boiler is turned ON and system water temperature increases

Check mark

Check the system thoroughly for any leaks during initial fill and boiler start-up

Check mark

Repair all leaks before proceeding further

Run this procedureArrow right

Heat Exchanger Cleaning

Check mark

Safety Precautions

Check mark

Ensure boiler is not frozen

Check mark

Shut off power and gas to the appliance if frozen

Check mark

Inspect boiler annually by a qualified service technician

Check mark

Turn off power to the boiler before service

Check mark

Boiler Shutdown and Preparation

Check mark

Shut down boiler following 'To Turn Off Gas to Appliance' instructions

Check mark

Allow boiler to cool to room temperature

Check mark

Access and Disassembly

Run this procedureArrow right

Ignition and Flame Sense Electrodes Inspection

Check mark

Safety Precautions

Check mark

Ensure the boiler is not frozen

Check mark

Shut off power and gas to the appliance if frozen

Check mark

Contact the factory for further instructions if frozen

Check mark

Turn off power to the boiler before service

Check mark

Inspection and Cleaning

Check mark

Remove the ignition and flame sense electrodes from the boiler heat exchanger access cover

Check mark

Remove deposits from the ignition/flame sense electrode using sandpaper

Check mark

Replace electrodes if they cannot be cleaned satisfactorily

Run this procedureArrow right

Fill Water Meter Check

Check mark

Safety Precautions

Check mark

Ensure the boiler is not frozen

Check mark

Shut off power and gas to the appliance if frozen

Check mark

Contact the factory for further instructions if frozen

Check mark

Turn off power to the boiler before any service operation

Check mark

Check Fill Water Meter

Check mark

Enter the current water usage from the fill water meter

Check mark

Is the water usage exceeding 5% of the system volume?

Check mark

If water usage exceeds 5%, check for leaks

Run this procedureArrow right

Wiring Check

Check mark

Safety Precautions

Check mark

Shut off power to the boiler

Check mark

Shut off gas to the appliance

Check mark

Inspection

Check mark

Inspect all boiler wiring for good condition

Check mark

Ensure all wires are securely attached

Check mark

Post-Inspection

Check mark

Is the wiring in acceptable condition?

Check mark

Describe any issues found during inspection

Run this procedureArrow right

Parts for Lochinvar Boiler WHB199N

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Vent Kit, Lochinvar, 2 Inch

100157609

Vent Kit, Lochinvar, 3 Inch

100157610

Vent Kit, Lochinvar, 4 Inch

100157611

Vent Kit, Centrotherm, 2 Inch

ISLPT0202

Vent Kit, Centrotherm, 3 Inch

ISLPT0303

Vent Kit, Lochinvar, 2 Inch

100157609

Vent Kit, Lochinvar, 3 Inch

100157610

Vent Kit, Lochinvar, 4 Inch

100157611

Vent Kit, Centrotherm, 2 Inch

ISLPT0202

Vent Kit, Centrotherm, 3 Inch

ISLPT0303

Vent Kit, Lochinvar, 2 Inch

100157609

Vent Kit, Lochinvar, 3 Inch

100157610

Vent Kit, Lochinvar, 4 Inch

100157611

Vent Kit, Centrotherm, 2 Inch

ISLPT0202

Vent Kit, Centrotherm, 3 Inch

ISLPT0303

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lochinvar

Explore Other Assets