MaintainX Logo
EnterprisePricing
JCB

JCB Tandem Roller CT260

Need answers fast?
Explore the manual using AI.

JCB Tandem Roller CT260
JCB Tandem Roller CT260

The JCB Tandem Roller CT260 is a robust and efficient compaction machine designed for optimal performance in various construction applications. Known for its durability and reliability, this roller model excels in achieving high-quality surface finishes on asphalt and soil. Ideal for contractors seeking a dependable asset for their fleet.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for JCB Tandem Roller CT260

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JCB Tandem Roller CT260

JCB Tandem Roller CT260

Create an account to install this asset package.

Maintenance Plans for JCB Tandem Roller Model CT260

Integrate maintenance plans directly into your work orders in MaintainX.

Hydraulic System Discharge

Check mark

1. Park the machine on firm level ground.

Check mark

2. Stop the engine.

Check mark

3. Turn the ignition to the off position.

Check mark

4. Remove the starter key.

Check mark

5. Wait for the specified time to dissipate any residual hydraulic pressure.

Check mark

Duration: 30 s;

Run this procedureArrow right

2000 Hourly or 2 Yearly Tandem Roller Maintenance

Check mark

Coolant System Drain and Fill

Check mark

Oil Filler and Dipstick O-rings Change

Check mark

Oil Replace

Check mark

Oil Reservoir Clean;

Run this procedureArrow right

Scraper Check

Check mark

Smooth Drum Scraper

Check mark

The scrapers are designed for use when rolling asphalt and in conjunction with the sprinkler system.

Check mark

If earth is being compacted the scrapers should be released from the drum.

Check mark

1. Make the machine safe.

Check mark

Refer to: Maintenance Positions (Page 87).

Check mark

2. Check the correct distance between the drum and the scraper.

Check mark

3. If necessary, loosen the fasteners on the scraper and set to the correct distance.

Check mark

Refer to: General (Page 92).

Check mark

4. Tighten the fasteners to the correct torque value.

Run this procedureArrow right

Battery Disconnect

Check mark

WARNING Keep metal watch straps and any metal fasteners on your clothes, clear of the positive (+) battery terminal. Such items can short between the terminal and nearby metal work. If it happens you can get burned.

Check mark

CAUTION The machine is negatively earthed. Always connect the negative pole of the battery to earth.

Check mark

When connecting the battery, connect the earth (-) lead last.

Check mark

When disconnecting the battery, disconnect the earth (-) lead first.

Check mark

CAUTION Understand the electrical circuit before connecting or disconnecting an electrical component. A wrong connection can cause injury and/or damage.

Check mark

Notice: Do not disconnect the battery while the engine is running, otherwise the electrical circuits may be damaged.

Check mark

1. Make the machine safe.

Check mark

Refer to: Maintenance Positions (Page 87).

Check mark

2. Get access to the batteries.

Run this procedureArrow right

Hydraulic Oil Replacement

Check mark

Notice: Ensure that dirt etc. does not enter the hydraulic system during this job. Hydraulic fluid at system pressure can injure you. Relieve the system pressure before changing the Hydraulic filter element. Drain the hydraulic tank when the oil is warm. More dirt is removed from the hydraulic system with warm oil than with cold.

Check mark

Machine made safe

Check mark

Filler cap (breather), drain plug and the surface of the hydraulic oil reservoir cleaned

Check mark

Filler cap removed

Check mark

Container of suitable size placed below the drain plug on the left hand side of the front chassis

Check mark

Drain plug removed and oil drained

Check mark

Drain plug installed

Check mark

Sign off on the hydraulic oil replacement

Run this procedureArrow right

Parts for JCB Tandem Roller CT260

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

JCB HP Hydraulic Fluid 46

4002/0805

JCB Special HP Grease

4003/2017

JCB Engine Oil EP 15W40

4001/1805

JCB Antifreeze HP/CoolantConcentrate

4006/1120

JCB HP Hydraulic Fluid 46

4002/0805

JCB Special HP Grease

4003/2017

JCB Engine Oil EP 15W40

4001/1805

JCB Antifreeze HP/CoolantConcentrate

4006/1120

JCB HP Hydraulic Fluid 46

4002/0805

JCB Special HP Grease

4003/2017

JCB Engine Oil EP 15W40

4001/1805

JCB Antifreeze HP/CoolantConcentrate

4006/1120

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JCB

Explore Other Assets