MaintainX Logo
EnterprisePricing
JCB

JCB Backhoe Loader 214 III

Need answers fast?
Explore the manual using AI.

JCB Backhoe Loader 214 III
JCB Backhoe Loader 214 III

The JCB Backhoe Loader 214 III is a versatile and robust piece of industrial equipment designed for construction and excavation tasks. Known for its reliability and efficiency, this model combines powerful performance with ease of maintenance, making it an essential asset for any job site.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for JCB Backhoe Loader 214 III

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JCB Backhoe Loader 214 III

JCB Backhoe Loader 214 III

Create an account to install this asset package.

Maintenance Plans for JCB Backhoe Loader Model 214 III

Integrate maintenance plans directly into your work orders in MaintainX.

Loader Cleaning

Check mark

Park the machine on firm level ground, engage the parking brake and set the transmission to neutral. Lower the attachments to the ground and stop the engine

Check mark

Machine parked and prepared for cleaning?

Check mark

Clean the machine using water and/or steam. Do not allow mud, debris etc to build upon the machine, pay particular attention to the following areas:

Check mark

Backhoe hoses passing through mainframe cleaned?

Check mark

Area around twin slew rams cleaned?

Check mark

Twin ram slew recess in chassis (centremount) cleaned?

Check mark

Kingpost slide rails (sideshift) cleaned?

Check mark

Kingpost hose tray and bottom 'shelf' (sideshift) cleaned?

Check mark

Recess between slew ram and kingpost casting (sideshift) cleaned?

Run this procedureArrow right

Tire Maintenance

Check mark

- Add air to the tyre

Check mark

These instructions are for adding air to a tyre which is already inflated. If the tyre has lost all its air pressure, call in a qualified tyre mechanic. The tyre mechanic should use a tyre inflation cage and the correct equipment to do the job

Check mark

WARNING!

Check mark

An exploding tyre can kill, inflated tyres can explode if overheated. Do not cut or weld the rims. Use a tyre/wheel specialist for all repair work

Check mark

2-3-2-7

Check mark

1. Prepare the Wheel

Check mark

Before you add air to the tyre, make sure it is correctly fitted on the machine or installed in a tyre inflation cage

Check mark

2. Prepare the Equipment

Check mark

Use only an air supply system which includes a pressure regulator. Set the regulator no higher than 1.38 bar (20 psi) above the recommended tyre pressure. See Section F, Technical Data for recommended tyres and pressures for your machine

Run this procedureArrow right

100 Hours Loader Engine Maintenance

Check mark

Change Engine Oil and Filter (AK and AR Build)

Check mark

Change Engine Fuel Filter (AK and AR Build)

Check mark

Clean Lift Pump Strainer (AK and AR Build Only)

Check mark

Check Coolant Quality/Level

Check mark

Drain and Clean Engine Fuel Sedimenter

Check mark

Check Fan Belt Tension/Condition

Check mark

Check Engine Mounting Bolts for Tightness

Check mark

Check All Hoses - Condition

Check mark

Sign off on the engine maintenance

Run this procedureArrow right

3 Yearly Seat Belt Maintenance

Check mark

WARNING! When a seat belt is fitted to your machine replace it with a new one if it is damaged, if the fabric is worn, or if the machine has been in an accident. Fit a new seat belt every three years

Check mark

Inspect the seat belt for signs of fraying and stretching

Check mark

Check that the stitching is not loose or damaged

Check mark

Check that the buckle assembly is undamaged and works correctly

Check mark

Check that the belt mounting bolts are undamaged, correctly fitted and tightened

Check mark

Sign off on the seat belt maintenance

Run this procedureArrow right

50 Hours / 1 Weekly Loader Engine Maintenance

Check mark

Check Engine Oil Level

Check mark

Drain Engine Fuel Filter

Check mark

Check Coolant Quality/Level

Check mark

Drain and Clean Engine Fuel Sedimenter

Check mark

Sign off on the engine maintenance

Run this procedureArrow right

Parts for JCB Backhoe Loader 214 III

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Male Adapter, 3/8 in. x 3/8 in.

1604/0003

Flow Test Adapter

460/15708

Bonded Washer, 1.1/4 in. BSP

1406/0029

Banjo Bolt

460/15707

Male Adapter, 3/4 in. x 1/2 in.

1606/0009

Male Adapter, 3/8 in. x 3/8 in.

1604/0003

Flow Test Adapter

460/15708

Bonded Washer, 1.1/4 in. BSP

1406/0029

Banjo Bolt

460/15707

Male Adapter, 3/4 in. x 1/2 in.

1606/0009

Male Adapter, 3/8 in. x 3/8 in.

1604/0003

Flow Test Adapter

460/15708

Bonded Washer, 1.1/4 in. BSP

1406/0029

Banjo Bolt

460/15707

Male Adapter, 3/4 in. x 1/2 in.

1606/0009

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JCB

Explore Other Assets