MaintainX Logo
EnterprisePricing
JCB

JCB Backhoe Loader 214 RT

Need answers fast?
Explore the manual using AI.

JCB Backhoe Loader 214 RT
JCB Backhoe Loader 214 RT

The JCB Backhoe Loader 214 RT is a versatile and powerful piece of construction equipment designed for efficient digging, lifting, and loading tasks. Known for its durability and performance, this model is ideal for various applications in construction and landscaping. Regular maintenance ensures optimal operation and longevity of the equipment.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for JCB Backhoe Loader 214 RT

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JCB Backhoe Loader 214 RT

JCB Backhoe Loader 214 RT

Create an account to install this asset package.

Maintenance Plans for JCB Backhoe Loader Model 214 RT

Integrate maintenance plans directly into your work orders in MaintainX.

Tire Maintenance

Check mark

- Add air to the tyre

Check mark

These instructions are for adding air to a tyre which is already inflated. If the tyre has lost all its air pressure, call in a qualified tyre mechanic. The tyre mechanic should use a tyre inflation cage and the correct equipment to do the job

Check mark

WARNING!

Check mark

An exploding tyre can kill, inflated tyres can explode if overheated. Do not cut or weld the rims. Use a tyre/wheel specialist for all repair work

Check mark

2-3-2-7

Check mark

1. Prepare the Wheel

Check mark

Before you add air to the tyre, make sure it is correctly fitted on the machine or installed in a tyre inflation cage

Check mark

2. Prepare the Equipment

Check mark

Use only an air supply system which includes a pressure regulator. Set the regulator no higher than 1.38 bar (20 psi) above the recommended tyre pressure. See Section F, Technical Data for recommended tyres and pressures for your machine

Run this procedureArrow right

Loader Cleaning

Check mark

- Clean the machine

Check mark

Park the machine on firm level ground, engage the parking brake and set the transmission to neutral. Lower the attachments to the ground and stop the engine

Check mark

Clean the machine using water and/or steam. Do not allow mud, debris etc to build upon the machine, pay particular attention to the following areas:

Check mark

1. Backhoe hoses passing through mainframe

Check mark

2. Around twin slew rams

Check mark

3. Twin ram slew recess in chassis (centremount)

Check mark

4. Kingpost slide rails (sideshift)

Check mark

5. Kingpost hose tray and bottom 'shelf' (sideshift)

Check mark

6. Recess between slew ram and kingpost casting (sideshift)

Run this procedureArrow right

100 Hours Loader Transmission Maintenance

Check mark

- Check Transmission Oil Level

Check mark

- Change Transmission Filter

Check mark

- Check Axle Oil Level (incl. Hubs when applicable)

Check mark

- Check Tyre Pressures/Condition

Check mark

- Check Front Hub Bearings

Check mark

- Security/Grease Drive Shafts

Check mark

- Check Steer Axle Movement/Shimming

Check mark

- Grease Steer Axle Pivots and Linkages

Check mark

- Grease Front Axle Main Pivot;

Run this procedureArrow right

Loader Check

Check mark

Inspect steelwork for damage

Check mark

Note damaged paintwork for future repair

Check mark

All pivot pins are correctly in place and secured by their locking devices

Check mark

Steps and handrails are undamaged and secure

Check mark

No broken or cracked window glass

Check mark

Replace damaged items

Check mark

All bucket teeth are undamaged and secure

Check mark

All lamp lenses are undamaged

Check mark

Tyres are undamaged and free from penetration by sharp objects

Run this procedureArrow right

3 Yearly Seat Belt Maintenance

Check mark

- Check the Seat Belt Condition and Security

Check mark

WARNING!

Check mark

When a seat belt is fitted to your machine replace it with a new one if it is damaged, if the fabric is worn, or if the machine has been in an accident. Fit a new seat belt every three years

Check mark

2-3-1-7/1

Check mark

1. Inspect the seat belt for signs of fraying and stretching

Check mark

2. Check that the stitching is not loose or damaged. Check that the buckle assembly is undamaged and works correctly

Check mark

3. Check that the belt mounting bolts are undamaged, correctly fitted and tightened;

Run this procedureArrow right

Parts for JCB Backhoe Loader 214 RT

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Male Adapter, 1 in M x 3/4 in M BSP

1606/0012

O-ring

2403/0108

Male Adapter, 3/4 in. x 3/8 in.

1606/0008

Black Primer 206J (30ml), For Direct Glazing

4201/4906

JCB Retainer (High Strength), 50ml, For All Retaining Parts Which Are Unlikely To Be Dismantled

4101/0651

Male Adapter, 1 in M x 3/4 in M BSP

1606/0012

O-ring

2403/0108

Male Adapter, 3/4 in. x 3/8 in.

1606/0008

Black Primer 206J (30ml), For Direct Glazing

4201/4906

JCB Retainer (High Strength), 50ml, For All Retaining Parts Which Are Unlikely To Be Dismantled

4101/0651

Male Adapter, 1 in M x 3/4 in M BSP

1606/0012

O-ring

2403/0108

Male Adapter, 3/4 in. x 3/8 in.

1606/0008

Black Primer 206J (30ml), For Direct Glazing

4201/4906

JCB Retainer (High Strength), 50ml, For All Retaining Parts Which Are Unlikely To Be Dismantled

4101/0651

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JCB

Explore Other Assets