Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
JCB Backhoe Loader 214-LE
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hours / 2 Yeary Loader Transmission Maintenance
Change Transmission Oil
Change Transmission Filter
Change Axle Oil (incl. Hubs when applicable)
Change Axle Oil - Limited Slip Differential
Check Tyre Pressures/Condition
Check Front Hub Bearings
Clean Transmission Strainer
Security/Grease Drive Shafts
Check Steer Axle Movement/Shimming
100 Hours Loader Engine Maintenance
Change Engine Oil and Filter (AK and AR Build)
Change Engine Fuel Filter (AK and AR Build)
Clean Lift Pump Strainer (AK and AR Build Only)
Check Coolant Quality/Level
Drain and Clean Engine Fuel Sedimenter
Check Fan Belt Tension/Condition
Check Engine Mounting Bolts for Tightness
Check All Hoses - Condition
Sign off on the 100 Hours Loader Engine Maintenance
500 Hours / 6 Monthy Loader Hydraulics Maintenance
Check Hydraulic Oil Level
Change Oil Filter
Check Rams - Chrome Condition
Sign off on the loader hydraulics maintenance
1 Daily Wheel Nut Check
On new machines, and whenever a wheel has been removed, check the wheel nut torques every two hours until they stay correct
Check that the wheel nuts are tight
The correct torques are shown in the table below: Front - Nm 680 / Ibf ft 500, Rear - Nm 680 / Ibf ft 500
WARNING! If, for whatever reason, a wheel stud is renewed, all the studs for that wheel must be changed as a set, since the remaining studs may have been damaged
Sign off on the wheel nut check
Loader Cleaning
- Clean the machine
Park the machine on firm level ground, engage the parking brake and set the transmission to neutral. Lower the attachments to the ground and stop the engine
Clean the machine using water and/or steam. Do not allow mud, debris etc to build upon the machine, pay particular attention to the following areas:
1. Backhoe hoses passing through mainframe
2. Around twin slew rams
3. Twin ram slew recess in chassis (centremount)
4. Kingpost slide rails (sideshift)
5. Kingpost hose tray and bottom 'shelf' (sideshift)
6. Recess between slew ram and kingpost casting (sideshift)
Access the parts list for your equipment in MaintainX.
Flow Test Adapter
460/15708
Banjo Bolt
460/15707
Bonded Washer, 1/4 in. BSP
1406/0011
Bonded Washer, 5/8 in. BSP
1406/0014
Bonded Washer, 1/2 in. BSP
1406/0018
Flow Test Adapter
460/15708
Banjo Bolt
460/15707
Bonded Washer, 1/4 in. BSP
1406/0011
Bonded Washer, 5/8 in. BSP
1406/0014
Bonded Washer, 1/2 in. BSP
1406/0018
Flow Test Adapter
460/15708
Banjo Bolt
460/15707
Bonded Washer, 1/4 in. BSP
1406/0011
Bonded Washer, 5/8 in. BSP
1406/0014
Bonded Washer, 1/2 in. BSP
1406/0018
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX