MaintainX Logo
EnterprisePricing
JCB

JCB Backhoe Loader 214-LE

Need answers fast?
Explore the manual using AI.

JCB Backhoe Loader 214-LE
JCB Backhoe Loader 214-LE

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for JCB Backhoe Loader 214-LE

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JCB Backhoe Loader 214-LE

JCB Backhoe Loader 214-LE

Create an account to install this asset package.

Maintenance Plans for JCB Backhoe Loader Model 214-LE

Integrate maintenance plans directly into your work orders in MaintainX.

2000 Hours / 2 Yeary Loader Transmission Maintenance

Check mark

Change Transmission Oil

Check mark

Change Transmission Filter

Check mark

Change Axle Oil (incl. Hubs when applicable)

Check mark

Change Axle Oil - Limited Slip Differential

Check mark

Check Tyre Pressures/Condition

Check mark

Check Front Hub Bearings

Check mark

Clean Transmission Strainer

Check mark

Security/Grease Drive Shafts

Check mark

Check Steer Axle Movement/Shimming

Run this procedureArrow right

100 Hours Loader Engine Maintenance

Check mark

Change Engine Oil and Filter (AK and AR Build)

Check mark

Change Engine Fuel Filter (AK and AR Build)

Check mark

Clean Lift Pump Strainer (AK and AR Build Only)

Check mark

Check Coolant Quality/Level

Check mark

Drain and Clean Engine Fuel Sedimenter

Check mark

Check Fan Belt Tension/Condition

Check mark

Check Engine Mounting Bolts for Tightness

Check mark

Check All Hoses - Condition

Check mark

Sign off on the 100 Hours Loader Engine Maintenance

Run this procedureArrow right

500 Hours / 6 Monthy Loader Hydraulics Maintenance

Check mark

Check Hydraulic Oil Level

Check mark

Change Oil Filter

Check mark

Check Rams - Chrome Condition

Check mark

Sign off on the loader hydraulics maintenance

Run this procedureArrow right

1 Daily Wheel Nut Check

Check mark

On new machines, and whenever a wheel has been removed, check the wheel nut torques every two hours until they stay correct

Check mark

Check that the wheel nuts are tight

Check mark

The correct torques are shown in the table below: Front - Nm 680 / Ibf ft 500, Rear - Nm 680 / Ibf ft 500

Check mark

WARNING! If, for whatever reason, a wheel stud is renewed, all the studs for that wheel must be changed as a set, since the remaining studs may have been damaged

Check mark

Sign off on the wheel nut check

Run this procedureArrow right

Loader Cleaning

Check mark

- Clean the machine

Check mark

Park the machine on firm level ground, engage the parking brake and set the transmission to neutral. Lower the attachments to the ground and stop the engine

Check mark

Clean the machine using water and/or steam. Do not allow mud, debris etc to build upon the machine, pay particular attention to the following areas:

Check mark

1. Backhoe hoses passing through mainframe

Check mark

2. Around twin slew rams

Check mark

3. Twin ram slew recess in chassis (centremount)

Check mark

4. Kingpost slide rails (sideshift)

Check mark

5. Kingpost hose tray and bottom 'shelf' (sideshift)

Check mark

6. Recess between slew ram and kingpost casting (sideshift)

Run this procedureArrow right

Parts for JCB Backhoe Loader 214-LE

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Flow Test Adapter

460/15708

Banjo Bolt

460/15707

Bonded Washer, 1/4 in. BSP

1406/0011

Bonded Washer, 5/8 in. BSP

1406/0014

Bonded Washer, 1/2 in. BSP

1406/0018

Flow Test Adapter

460/15708

Banjo Bolt

460/15707

Bonded Washer, 1/4 in. BSP

1406/0011

Bonded Washer, 5/8 in. BSP

1406/0014

Bonded Washer, 1/2 in. BSP

1406/0018

Flow Test Adapter

460/15708

Banjo Bolt

460/15707

Bonded Washer, 1/4 in. BSP

1406/0011

Bonded Washer, 5/8 in. BSP

1406/0014

Bonded Washer, 1/2 in. BSP

1406/0018

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JCB

Explore Other Assets