The JCB Backhoe Loader 215 III is a versatile and powerful machine designed for construction and excavation tasks. Known for its durability and efficiency, this model offers exceptional performance in various applications, making it a preferred choice among contractors and operators.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

JCB Backhoe Loader 215 III
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
500 Hours / 6 Monthy Loader Hydraulics Maintenance
Check Hydraulic Oil Level
Change Oil Filter
Check Rams - Chrome Condition
Sign off on the loader hydraulics maintenance
3 Yearly Seat Belt Maintenance
WARNING! When a seat belt is fitted to your machine replace it with a new one if it is damaged, if the fabric is worn, or if the machine has been in an accident. Fit a new seat belt every three years
Inspect the seat belt for signs of fraying and stretching
Check that the stitching is not loose or damaged. Check that the buckle assembly is undamaged and works correctly
Check that the belt mounting bolts are undamaged, correctly fitted and tightened
Sign off on the seat belt maintenance
Tire Maintenance
WARNING! An exploding tyre can kill, inflated tyres can explode if overheated. Do not cut or weld the rims. Use a tyre/wheel specialist for all repair work
Is the tyre correctly fitted on the machine or installed in a tyre inflation cage?
Set the regulator no higher than 1.38 bar (20 psi) above the recommended tyre pressure.
Is the air hose fitted with a self-locking air chuck and remote shut-off valve?
Is the air hose correctly connected to the tyre valve?
Inflate the tyre to the recommended pressure. Do not over-inflate.
Sign off on the tyre maintenance
2000 Hours / 2 Yeary Loader Transmission Maintenance
- Change Transmission Oil
- Change Transmission Filter
- Change Axle Oil (incl. Hubs when applicable)
- Change Axle Oil - Limited Slip Differential
- Check Tyre Pressures/Condition
- Check Front Hub Bearings
- Clean Transmission Strainer
- Security/Grease Drive Shafts
- Check Steer Axle Movement/Shimming
1 Yearly Fire Extinguisher Service
Check the fire extinguisher for damage, security and signs of leaking
Check that the gauge B indicates that the extinguisher is charged ie. the needle is in the GREEN segment
Note: If the needle is in or very near the RED segment at either end of the gauge, the extinguisher must be serviced or replaced
Make sure the safety pin is fitted and secure
The extinguisher should be serviced every 12 months by a suitably qualified person
Check the ROPS/FOPS Structure (p.49)
Sign off on the fire extinguisher service
Access the parts list for your equipment in MaintainX.
High Strength Gasketing
4102/0502
JCB Threadlocker And Sealer (10 ml), A High Strength Locking Fluid For Sealing And Retaining Nuts, Bolts, And Screws Up To 50Mm Diameter, And For Hydraulic Fittings Up To 25Mm Diameter
4101/0250
Male Adapter, 1.1/4 in M BSP x 1 in M BSP
1606/0015
Male Adapter, 1 in M x 3/4 in M BSP
1606/0012
Ultra Fast Adhesive (310ml), For Direct Glazing
4103/2109
High Strength Gasketing
4102/0502
JCB Threadlocker And Sealer (10 ml), A High Strength Locking Fluid For Sealing And Retaining Nuts, Bolts, And Screws Up To 50Mm Diameter, And For Hydraulic Fittings Up To 25Mm Diameter
4101/0250
Male Adapter, 1.1/4 in M BSP x 1 in M BSP
1606/0015
Male Adapter, 1 in M x 3/4 in M BSP
1606/0012
Ultra Fast Adhesive (310ml), For Direct Glazing
4103/2109
High Strength Gasketing
4102/0502
JCB Threadlocker And Sealer (10 ml), A High Strength Locking Fluid For Sealing And Retaining Nuts, Bolts, And Screws Up To 50Mm Diameter, And For Hydraulic Fittings Up To 25Mm Diameter
4101/0250
Male Adapter, 1.1/4 in M BSP x 1 in M BSP
1606/0015
Male Adapter, 1 in M x 3/4 in M BSP
1606/0012
Ultra Fast Adhesive (310ml), For Direct Glazing
4103/2109
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX