Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Greenheck Fume Exhaust Fan FJI-10
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Equipment Check
Safety Precautions
Disconnect and secure to the OFF position all electrical power to the fan prior to inspection or servicing.
Pre-Start Checks
Confirm that building supply voltage matches the voltage for which the unit is wired.
Check all piping and wiring penetrations made by contractors for water tightness.
Rotate the fan wheel manually to ensure it is free to operate and remove any dirt or debris.
Check the fan bearing setscrews for tightness.
Check alignment of sheaves and V-belts.
Inspect all fasteners to ensure none have loosened during shipment.
Belt Tension Check
Initial Inspection
Check for wear, tension, alignment, and dirt accumulation on V-belt drives
Are the sheaves free from grooves or wear?
Belt Replacement
Are all belts being replaced with a matched set?
Loosen belt tension to remove belts without prying
Ensure slack in each belt is on the same side of the drive after replacement
Tension Adjustment
Measure belt deflection halfway between sheave centers (in inches)
Wheel Rotation Check
Pre-Check Precautions
Ensure the unit is attached to the designed system
Wheel Rotation Verification
Momentarily energize the unit to check wheel rotation
Is the wheel rotation in the same direction as the airflow at the outlet?
Does the wheel rotation conform to the rotation decal affixed to the unit?
Post-Check Actions
Describe any issues noted during the check
Technician's signature
Initial 24 Hours Radial Gap and Wheel Alignment Check
Radial Gap Adjustment
Loosen the inlet cone/ring bolts
Center the cone/ring on the wheel
Is additional adjustment required to maintain a constant radial gap?
Loosen the bearing bolts and center the wheel if necessary
Overlap Adjustment
Loosen the wheel hub from the shaft
Move the wheel to the desired position along the shaft
Check for a smooth transition between the inlet cone and wheel
Bearing Replacement
Preliminary Steps
Ensure power source is locked out
Loosen and remove belts and pulleys
Disconnect extended lubrication lines at the bearing
Bearing Removal
Read and follow all instructions carefully
Ensure driven sheaves and belts have been removed
Remove shaft black coating with solvent
Scribe a line around the shaft by both bearings and around the bearing base
Access the parts list for your equipment in MaintainX.
Pnt Field Repair KIT
HAZ2597
Concrete Grey Repair KIT
RAL 7023
Pnt Field Repair KIT
HAZ2597
Concrete Grey Repair KIT
RAL 7023
Pnt Field Repair KIT
HAZ2597
Concrete Grey Repair KIT
RAL 7023
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.