

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

J.P. Sauer & Sohn Maschinenbau Compressor WP66L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
4000 Hourly / 4 Yearly Compressor Gudgeon Pins and Gudgeon Pin Bearings Replacement
Preparation
Ensure all protective equipment is worn
Ensure crane and lifting gear are available
Ensure 'Staburags N12' grease is available
Removing Cylinders
Loosen and unscrew the cylinder foot nuts
Carefully pull the cylinders off the crankcase over the studs
Take off the cylinder foot gasket and dispose of it in an environmentally sound manner
Clean the sealing surfaces on the cylinder foot and crankcase
Solenoid Valve Compression Maintenance
Safety Precautions
Wear protective gloves
Wear work clothing
Wear safety boots
Ensure power supply is disconnected and secured against reconnection
Secure live cables against direct contact
Install live cables in line with applicable standards and directives
Disassembly of Solenoid Drain Valve
Unscrew the hexagon nuts
Initial 50 Hours Compressor Air Filter Insert Replacement
Safety Precautions
Ensure all protective equipment is worn
Air Filter Replacement
Loosen clamps and remove the air filter cover
Remove the air filter insert from the air filter housing
Clean the air filter housing with a lint-free cloth
Fit a new air filter insert in the air filter housing
Attach the air filter cap and close the clamps
Post Replacement Check
2000 Hourly / 2 Yearly Compressor Second Stage Valves Check
Protective Equipment
Ensure all protective equipment is worn
Notices
Ensure only new gaskets are used for re-installation of valves, cylinder heads, and cylinders
Ensure only genuine Sauer spare parts are used
Ensure used valves are replaced and disposed of, not repaired
Valve Exterior Check
Check the exterior of the valve for issues
Establish and describe the cause of any faults found
4000 Hourly / 4 Yearly Compressor Second Stage Valves Replacement
Safety Precautions
Ensure all protective equipment is worn
Important Notices
Ensure only new gaskets are used to prevent leakages
Use only genuine Sauer spare parts to avoid damage
Replace and dispose of used valves, do not repair
Removal of Air Filter and Pipe Unions
Loosen the screw on the air filter flange and remove the air filter
Unscrew and remove the pipe unions and hose lines at the cylinder heads
Access the parts list for your equipment in MaintainX.
Service Kit
069335
Service Kit
069336
Service Kit
069326
Service Kit
069335
Service Kit
069336
Service Kit
069326
Service Kit
069335
Service Kit
069336
Service Kit
069326
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













