MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z6034

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z6034
Genie Articulated Boom Lift Z6034

The Genie Articulated Boom Lift Z6034 is a versatile and reliable aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it an essential asset for construction and maintenance tasks.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z6034

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z6034

Genie Articulated Boom Lift Z6034

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z6034

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Turntable Rotation Bearing Lubrication

Check mark

- Grease the Turntable Rotation Bearing and Rotate Gear

Check mark

Perform this procedure more often if dusty conditions exist and when operating the machine in high temperature environments

Check mark

Frequent application of lubrication to the turntable bearing and rotate gear is essential to good machine performance and service life. Continued use of an improperly greased bearing and gear will result in component damage

Check mark

1. Locate the grease fitting for the turntable rotate bearing

Check mark

2. Pump grease into the turntable rotation bearing. Rotate the turntable in increments of 4 to 5 inches / 10 to 13 cm at a time and repeat this step until the entire bearing has been greased

Check mark

3. Models with Drive Gear: Apply grease to each tooth of the drive gear, located under the turntable

Check mark

Models with Worm Drive Gear: Grease each tooth on the outside of the turntable rotation bearing

Check mark

Models with Worm Drive Gear:

Check mark

1. Locate the 2 grease fittings on top of the worm drive housing

Run this procedureArrow right

3 Monthly Alarm Package Test

Check mark

- Test the Alarm Package (if equipped)

Check mark

Note: The alarms and beacon will operate with the engine running or not running

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

Z-80/60, S-80 XC, S-85 XC, S-100, S-105, S-120, S-125, S-100HD, S-120HD, SX-105 XC, SX-125 XC, SX-135 XC, SX-150, SX-180, Z-135/70 and ZX-135/70 Models:

Check mark

Result: The alarm should sound twice. The flashing beacon should be on and flashing

Check mark

All other models:

Check mark

Result: The flashing beacon should be on and flashing

Check mark

All Models:

Check mark

2. Activate the boom down function, hold for a moment and then release it

Run this procedureArrow right

3 Monthly Brake Configuration Check

Check mark

- Confirm the Proper Brake Configuration

Check mark

1. Locate the drive hub disconnect cap

Check mark

2. Check each drive hub disconnect cap to be sure it is in the engaged position

Check mark

- Test the Drive Brakes

Check mark

WARNING!

Check mark

Collision hazard. Be sure that the machine is not in free-wheel or partial free-wheel configuration

Check mark

Refer to maintenance procedure, Confirm the Proper Brake Configuration

Check mark

Note: Select a test area that is firm, level and free of obstructions

Check mark

1. Mark a test line on the ground for reference

Run this procedureArrow right

1 Yearly Dual Capacity And Platform Overload System S-models Test

Check mark

- Test the Dual Capacity and Platform Overload System - SX-105 XC, SX-125 XC and SX-135 XC Models Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load

Check mark

Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

1. Remove all weight, tools, accessories and equipment from the platform

Check mark

Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test

Check mark

2. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

3. Using a suitable lifting device, place a test weight of 600 lbs / 272kg in the center of the platform. Secure the weight to the platform

Check mark

Note: The test weight may be within -0% / +5%

Check mark

Result: The unrestricted range of motion indicator light is on at ground controls

Run this procedureArrow right

3 Monthly Platform Self-Leveling Test

Check mark

- Test the Platform Self-leveling

Check mark

1. At the ground controls, lower the boom to the stowed position

Check mark

2. Activate function enable and adjust the platform to a level position

Check mark

3. Raise and lower the primary boom through a full cycle

Check mark

Result: The platform should remain level at all times to within +/-5 degrees;

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z6034

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets