The Genie Articulated Boom Lift 85S-XC is a versatile aerial work platform designed for enhanced reach and maneuverability in various industrial applications. Known for its reliability and performance, this model is ideal for construction, maintenance, and other demanding tasks requiring elevated access.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift 85S-XC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift 85S-XC

Genie Articulated Boom Lift 85S-XC

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model 85S-XC

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Platform Load Sense System Test

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Ensure no load sense system faults exist prior to performing this procedure

Check mark

On a properly functioning machine, the LEDs on both control modules, located next to the ground control box, should be off

Check mark

All weight, tools, accessories and equipment removed from the platform?

Check mark

Key switch turned to ground control and red Emergency Stop button pulled out to the on position at both ground and platform controls?

Check mark

Engine started from the ground controls?

Check mark

Enter the weight of the test weight placed on the center of the platform floor

Check mark

Did the amber restricted range of motion LED at the platform controls come on and the engine continued to run?

Check mark

Enter the total weight in the platform after placing additional test weight

Run this procedureArrow right

3 Monthly Electrical Wiring Inspection

Check mark

- Inspect the Electrical Wiring

Check mark

WARNING!

Check mark

Electrocution/burn hazard

Check mark

Contact with electrically charged circuits could result in death or serious injury. Remove all rings, watches and other jewelry

Check mark

1. Inspect the following areas for burnt, chafed, corroded pinched and loose wires:

Check mark

Note: Inspection areas will vary by model

Check mark

• Engine wiring harness

Check mark

• Engine relay block

Check mark

• Hydraulic manifold wiring

Run this procedureArrow right

100 Hourly Ford Engine Maintanance

Check mark

- Check Oil Level

Check mark

- Check Coolant Level

Check mark

- Check/adjust Engine belts

Check mark

- Check/replace Fuel Filters

Check mark

- Replace Engine oil

Check mark

- Replace Oil filter

Check mark

- Replace Air filter

Check mark

- Clean/Adjust/Replace Spark plugs

Check mark

- Tighten/Replace Loose or missing fasteners

Run this procedureArrow right

50 Hourly Track Tension and Fastener Torque Check

Check mark

Track assembly cleaned of any dirt, rocks, clay, etc.

Check mark

Tracks chocked at one end of the machine to prevent rolling

Check mark

Lifting jack of ample capacity (20,000 Ibs / 10,000 kg) centered under the drive chassis between the tracks at the other end of the machine

Check mark

Machine lifted until the tracks are off the ground and jack stands placed under the drive chassis for support

Check mark

Visual inspection of the section of track under the bogey wheels performed

Check mark

Gap between the bogey wheels and the inside surface of the track

Check mark

Tensioner jam nut and idler axle bolts on both sides of the tensioner wheel loosened and tensioner nut tightened until there is between 0.75 - 1 inch / 1.9 - 2.5 cm of gap between the bogey wheels and the inside surface of the track

Check mark

NOTICE! Component damage hazard. Do not over tighten the track. Over tightening the track will cause the machine to lose power during operation

Check mark

Jam nut tightened

Run this procedureArrow right

3 Monthly Oscillate Directional Valve Linkage Inspection

Check mark

- Check the Oscillate Directional Valve Linkage (if equipped)

Check mark

1. Remove the drive chassis cover and the axle covers from the non-steer end of the drive chassis

Check mark

2. Locate the oscillate directional valve inside of the non-steer axle and inspect the linkage for the following:

Check mark

1) Lock nut is tight against yoke

Check mark

2) Yoke clevis pins are installed

Check mark

3) Cotter pins are installed through clevis pins

Check mark

4) Linkage is properly attached to directional valve;

Run this procedureArrow right

Parts for Genie Articulated Boom Lift 85S-XC

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets