

The Genie Articulated Boom Lift S-45 HF is a versatile aerial work platform designed for enhanced reach and maneuverability. Ideal for construction and maintenance tasks, this model offers robust performance and safety features, ensuring efficient operation in various environments. Trust Genie for reliable, high-quality equipment solutions.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift S-45 HF
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
50 Hourly Track Tension and Fastener Torque Check
- Check the Track Tension and Fastener Torque, TRAX Models - S-40 and S-45 Models
Maintaining proper track tension and properly torqued fasteners is essential to good machine performance and service life; The machine will not operate properly with a track that is incorrectly tensioned. Continued use of a machine with incorrectly tensioned tracks may cause component damage
1. Thoroughly clean the track assembly of any dirt, rocks, clay, etc.
2. Chock the tracks at one end of the machine to prevent the machine from rolling
3. Center a lifting jack of ample capacity (20,000 Ibs / 10,000 kg) under the drive chassis between the tracks at the other end of the machine
4. Lift the machine until the tracks are off the ground and then place jack stands under the drive chassis for support
5. Visually inspect the section of track under the bogey wheels
Result: There should be less than 1 inch / 2.5 cm of gap between the bogey wheels and the inside surface of the track. Proceed to step 7
Result: There is 1 inch / 2.5 cm or more of gap between the bogey wheels and the inside surface of the track. Proceed to step 6
50 Hourly Kubota Engine Maintanance
- Check Coolant Level
- Check Oil Level
- Replace Engine oil , Z482
- Check Fan belt tension and damage
- Check Battery electrolyte level
- Check Spark plug
- Clean Air cleaner element (Replace the element after 6 times cleaning)
- Clean Fuel filter (element type)
- Replace Oil filter cartridge, Z482
1 Yearly Dual Capacity And Platform Overload System Z-45 XC Test
Warning: This procedure requires trained personnel. Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface.
Remove all weight, tools, accessories and equipment from the platform
Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls
Place a test weight of 600 lbs / 272kg in the center of the platform using a suitable lifting device
Start the engine and extend the primary boom
Add an additional 100 lbs / 45kg to the platform
Extend the primary boom
Add an additional 320 lbs / 145kg to the platform
Using a suitable lifting device, remove all test weights from the platform
3 Monthly Safety Envelope Limit Switch Test
Warning: This procedure requires two trained personnel. Perform this procedure with the boom in the stowed position and the axles extended.
Z-135/70 and ZX-135/70 Models: Secondary Boom #1 Retracted Safety Limit Switch, LSS1RS
Lower turntable riser end cover properly supported and secured to a suitable lifting device
Upper turntable riser end cover properly supported and secured to a suitable lifting device
Secondary boom #1 retracted safety limit switch (LSS1RS) located inside the secondary boom tube
Engine started from the ground controls and secondary boom fully raised
Deutsch connector to LSS1RS disconnected and multimeter leads connected to pins 1 and 2 at the Deutsch connector of the limit switch cable
Limit switch does not have continuity
Deutsch connector reconnected to the limit switch and secondary boom extended while visually inspecting the roller arm of the limit switch
1 Yearly Platform Overload System Test
- Test the Platform Overload System - All Models (if equipped), Except ALC1000, S-60HC, S-80XC, S-85XC and Z-45XC Models
Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load
Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over
This maintenance procedure applies to the following models: S-40, S-45, S-60, S-65, S-80, S-85, Z-45/25 (J), Z-51/30J, Z-30/20N (RJ), Z-34/22, Z-34/22 (N), Z-34/22 IC, Z-40/23N (RJ), Z-45/25 (J) DC, 2-45/25 (J) Bi-Energy, Z-60 DC/FE, Z-62/40 and models equipped with the 340 kg capacity option
Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface
1. Remove all weight, tools, accessories and equipment from the platform
Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test
2 Engine Models: Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls. Start the engine from the ground controls and level the platform. Do not turn the engine off
DC Models: Turn the key switch to ground controls and pull out the red Emergency Stop button to the on position at both the ground and platform controls. Level the platform
Access the parts list for your equipment in MaintainX.
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













