MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift S-45 HF

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift S-45 HF
Genie Articulated Boom Lift S-45 HF

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift S-45 HF

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift S-45 HF

Genie Articulated Boom Lift S-45 HF

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model S-45 HF

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Secondary Boom Angle Sensor Test

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

A properly functioning secondary boom angle sensor is essential to safe machine operation.

Check mark

The ECM at the ground controls (TCON) monitors the position and angle of the secondary boom using the signal from the secondary boom angle sensor.

Check mark

The secondary boom angle sensor signal is used to control the ramping of the secondary boom.

Check mark

Note:The turntable level sensor must be tested before starting this procedure.

Check mark

Note: A digital level will be required to perform this procedure.

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses.

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration. Refer to the manufactures calibration information.

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure.

Run this procedureArrow right

3 Monthly Safety Envelope Limit Switches And Angle Sensor Check

Check mark

- Check the Safety Envelope Limit Switches and Angle Sensor - S-60X, S-60XC and S-80X

Check mark

Testing the safety envelope system regularly is essential to safe machine operation. Continued use of an improperly operating safety envelope could result in the system not restricting the range of motion. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Perform this procedure with the machine on a firm, level surface with all weight, tools and equipment removed from the platform

Check mark

Note: Start this procedure with the boom fully retracted and in the stowed position

Check mark

Ground controls:

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position

Check mark

2. Start the engine from the ground controls

Check mark

3. Turn and hold the function enable switch to the restricted maximum platform capacity and raise the primary boom until it is fully elevated

Check mark

4. Extend the primary boom until it is fully extended

Run this procedureArrow right

50 Hourly Perkins Engine Maintanance

Check mark

Clean Air filter discharge valve

Check mark

Check for leaks Oil, fuel and coolant systems

Check mark

Inspect/adjust/replace Alternator belt

Check mark

Check/Add Coolant level

Check mark

Check Oil level

Check mark

DrainFuel system filter/water separator

Check mark

Check/Drain Engine air precleaner

Check mark

Check Battery electrolyte level

Check mark

Test/Add Cooling system supplement additive

Run this procedureArrow right

1 Yearly Platform Overload System Test

Check mark

- Test the Platform Overload System - All Models (if equipped), Except ALC1000, S-60HC, S-80XC, S-85XC and Z-45XC Models

Check mark

Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load

Check mark

Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over

Check mark

This maintenance procedure applies to the following models: S-40, S-45, S-60, S-65, S-80, S-85, Z-45/25 (J), Z-51/30J, Z-30/20N (RJ), Z-34/22, Z-34/22 (N), Z-34/22 IC, Z-40/23N (RJ), Z-45/25 (J) DC, 2-45/25 (J) Bi-Energy, Z-60 DC/FE, Z-62/40 and models equipped with the 340 kg capacity option

Check mark

Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

1. Remove all weight, tools, accessories and equipment from the platform

Check mark

Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test

Check mark

2 Engine Models: Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls. Start the engine from the ground controls and level the platform. Do not turn the engine off

Check mark

DC Models: Turn the key switch to ground controls and pull out the red Emergency Stop button to the on position at both the ground and platform controls. Level the platform

Run this procedureArrow right

100 Hourly GM 3.0L Engine Maintanance

Check mark

Check coolant level

Check mark

Check oil level

Check mark

Check oil, fuel, and coolant systems for leaks

Check mark

Drain/clean LPG vaporizer

Check mark

Clean/replace air cleaner element

Check mark

Replace engine oil and filter

Check mark

Replace fuel filter

Check mark

Replace air filter

Check mark

Replace distributor cap

Run this procedureArrow right

Parts for Genie Articulated Boom Lift S-45 HF

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets