MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z40N08-675

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z40N08-675
Genie Articulated Boom Lift Z40N08-675

The Genie Articulated Boom Lift Z40N08-675 is a versatile aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it a reliable choice for contractors and maintenance professionals.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z40N08-675

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z40N08-675

Genie Articulated Boom Lift Z40N08-675

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z40N08-675

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Jib Rotate Bearing Maintenance

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

Check the Jib Rotator Fastener torque

Check mark

Confirm that each jib rotator outer mounting bolt is torqued in sequence to specification

Check mark

Repeat the procedure for the inner mounting bolts

Check mark

Jib boom rotate bearing bolts: 200 ft-Ibs/ 271 Nm

Check mark

While rotating the jib, pump grease into each bearing lubricating grease fitting until fresh grease is visible at the outer seal

Check mark

While rotating the jib, pump grease into the worm gear grease fitting until fresh grease is visible at one sealing lip or bearing cap

Check mark

Place a 750 lb / 340 kg weight in the platform and raise the jib until it is horizontal and parallel with the boom

Run this procedureArrow right

3 Monthly Boom Angle Sensor Test

Check mark

- Test the Primary Boom Angle Sensor - SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180

Check mark

A properly functioning primary boom angle sensor is essential to safe machine operation. The ECM at the ground controls (TCON) monitors the position and angle of the primary boom using the signal from the primary boom angle sensor

Check mark

The primary boom angle sensor signal is used to control the ramping of the primary boom, limiting the speed of the primary boom to 2.3 feet / 0.7 meters per second

Check mark

Note: The turntable level sensor must be tested before starting this procedure. Refer to Maintenance Procedures, Test the Turntable Level Sensor

Check mark

Note: A digital level will be required to perform this procedure

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration. Refer to the manufactures calibration information

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Note: Perform this procedure with the booms in the fully stowed position and the axles fully extended

Run this procedureArrow right

100 Hourly Ford Engine Maintanance

Check mark

Check Oil Level

Check mark

Check Coolant Level

Check mark

Check/adjust Engine belts

Check mark

Check/replace Fuel Filters

Check mark

Replace Engine oil

Check mark

Replace Oil filter

Check mark

Replace Air filter

Check mark

Clean/Adjust/Replace Spark plugs

Check mark

Tighten/Replace Loose or missing fasteners

Run this procedureArrow right

2000 Hourly / 3 Monthly Hydraulic Oil Maintenance

Check mark

Hydraulic Oil Inspection

Check mark

Visual inspection of hydraulic oil color (should be a clear, light-honey color)

Check mark

Visual inspection of hydraulic oil appearance (should be clear and not cloudy or visibly distorts the view through the sight glass or container)

Check mark

Visual inspection of hydraulic oil contamination (should contain no particles, foreign objects, or other contamination)

Check mark

Smell test of hydraulic oil (can smell 'hot' but not 'burnt')

Check mark

Feel test of hydraulic oil (should feel viscous and free of any rough feel due to particles)

Check mark

If the hydraulic oil fails any of the above inspections, the hydraulic oil must be tested by an oil distributor or replaced

Check mark

If the hydraulic oil was not replaced at or before the 2000 hour maintenance interval, the oil must be tested every quarter by an oil distributor until the oil fails the test and is replaced

Check mark

After the oil has been replaced, continue the scheduled quarterly maintenance inspection

Run this procedureArrow right

3 Monthly Operator Protection Alarm Test

Check mark

Warning: This test requires trained personnel with PPE!

Check mark

Is the key switch turned to platform control?

Check mark

Is the red Emergency Stop button in the on position at both the ground and platform controls?

Check mark

Is the engine started from the platform controls (for engine powered models)?

Check mark

Does pressing down on the operator protection activation strip not trigger any alarm or flashing beacon?

Check mark

Does activating the foot switch and pressing down on the operator protection activation bar for longer than 0.4 seconds trigger an intermittent audible alarm and flashing beacon?

Check mark

Does the engine shut down and boom functions get disabled (for engine models)?

Check mark

Does a continuous audible alarm sound after 10 seconds?

Check mark

Does pressing the reset button turn off the audible alarm and flashing beacon?

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z40N08-675

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets