Genie Articulated Boom Lift Z-40/23/N RJ
Genie Articulated Boom Lift Z-40/23/N RJ

The Genie Articulated Boom Lift Z-40/23/N RJ is a versatile and reliable aerial work platform designed for optimal reach and maneuverability. Ideal for construction and maintenance tasks, this boom lift offers exceptional performance and safety features, making it a preferred choice among professionals in the industry.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-40/23/N RJ

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-40/23/N RJ

Genie Articulated Boom Lift Z-40/23/N RJ

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-40/23/N RJ

Integrate maintenance plans directly into your work orders in MaintainX.

2000 Hourly Turntable Rotation Gear Backlash Check

Check mark

Warning: This procedure does not apply to the Z-60/80 models

Check mark

Perform this procedure with the machine fully stowed and the counterweight at the square end of the machine

Check mark

Perform this procedure with the machine on a firm, level surface that is free of obstructions

Check mark

Is the boom centered between the circle end wheels?

Check mark

Did you apply approximately 20 lbs / 89 N of side force to the platform, moving the platform to one side as far as it will go?

Check mark

Enter the gap between the swing hub pinion gear and the turntable rotation bearing at the center tooth on one of the drive hubs

Check mark

Select the model of the machine

Check mark

Is the backlash within tolerance?

Check mark

If the backlash needs to be adjusted, refer to Repair Procedure in the appropriate Service and Repair Manual for your machine, How to Adjust the Turntable Rotation Gear Backlash

Run this procedureArrow right

1 Yearly Turntable Bearing Inspection

Check mark

Warning: Perform this procedure with the machine on a firm, level surface with the boom in the stowed position.

Check mark

Grease the turntable bearing

Check mark

Torque the turntable bearing bolts to specification

Check mark

Raise the boom to full height using the ground controls

Check mark

Place a dial indicator between the drive chassis and the turntable

Check mark

Adjust the dial indicator needle to the 'zero' position

Check mark

Lower the boom to a horizontal position and fully extend the boom

Check mark

Enter the reading on the dial indicator

Check mark

Move the booms to the positions indicated in step 3. Visually inspect the dial indicator to be sure the needle returns to the 'zero' position

Run this procedureArrow right

2000 Hourly Hydraulic Oil Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Hydraulic oil test passed?

Check mark

If hydraulic oil test failed, proceed to replace the hydraulic oil.

Check mark

Replacing the hydraulic oil:

Check mark

Drain plug from the hydraulic tank removed?

Check mark

Hydraulic tank completely drained into a suitable container?

Check mark

Tank filled with the proper hydraulic oil for your machine?

Check mark

Pump primed?

Check mark

Clean up and proper disposal of any oil that may have spilled?

Run this procedureArrow right

2000 Hourly Free-Wheel Configuration Check

Check mark

- Check the Free-wheel Configuration

Check mark

Proper use of the free-wheel configuration is essential to safe machine operation. The free-wheel configuration is used primarily for towing. A machine configured to free-wheel without operator knowledge may cause death or serious injury and property damage

Check mark

Models with 2 wheel steer will be referenced with Non-steer and steer wheels

Check mark

Models with 4 wheel steer will be referenced with Circle-end and Square-end wheels

Check mark

WARNING!

Check mark

Collision hazard. Select a work site that is firm and level

Check mark

NOTICE:

Check mark

Component damage hazard. If the machine must be towed, do not exceed 2 mph / 3.2 km/h

Check mark

Non-steer or Circle-end wheels:

Run this procedureArrow right

3 Monthly Drive Speed ALC1000 Test

Check mark

- Test the Drive Speed - Raised or Extended Position, ALC1000 Models

Check mark

Proper drive function is essential to safe machine operation. The drive function should respond quickly and smoothly to operator control

Check mark

Drive performance should also be free of hesitation, jerking and unusual noise over the entire proportionally controlled speed range

Check mark

Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions

Check mark

This maintenance procedure applies to the following models: S-100, S-105, S-120, S-125, SX-105 XC, SX-125 XC, SX-135 XC, S-100HD, S-120HD, SX-150, SX-180, 2-80/60, Z-135/70 and ZX-135/70

Check mark

S-100, S-105, S-120, S-125, SX-105 XC, SX-125 XC, SX-135 XC, S-100HD and S-120HD

Check mark

1. Create start and finish lines by marking two lines on the ground 40 feet / 12.2 m apart

Check mark

2. Raise the boom to a horizontal position

Check mark

3. Extend the primary boom until the envelope alarm and LED are activated

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-40/23/N RJ

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets