The Genie Articulated Boom Lift SX-150 is a versatile and powerful aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it a reliable choice for contractors and maintenance professionals.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift SX-150
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Platform Self-Leveling Test
Test the Platform Self-leveling
Lower the boom to the stowed position at the ground controls
Activate function enable and adjust the platform to a level position
Raise and lower the primary boom through a full cycle
Enter the degree of deviation from level position
The platform remained level at all times to within +/-5 degrees
Sign off on the platform self-leveling test
3 Monthly Safety Envelope And Circuit Test
- Test the Safety Envelope and Circuits - Z-80/60
Testing the machine safety envelope is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability is compromised and may tip over
For limit switch and angle sensor information, Refer to appropriate Service and Repair Manual for your machine
Note: Use the following chart to identify the description of each LCD screen control button used in this procedure
Secondary Boom #1 Angle Safety Limit Switch, LSS2AS
1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls
2. Start the engine from the ground controls
3. Press the (plus)(minus) buttons on the LCD screen to activate status mode
4. Press the enter or previous button on the LCD screen until secondary boom length is displayed
50 Hourly Track Tension and Fastener Torque Check
Warning: This procedure requires trained personnel with PPE!
Track assembly cleaned of any dirt, rocks, clay, etc.
Tracks chocked at one end of the machine to prevent rolling
Machine lifted until the tracks are off the ground and jack stands placed under the drive chassis for support
Visual inspection of the section of track under the bogey wheels completed
Gap between the bogey wheels and the inside surface of the track
Tensioner jam nut and idler axle bolts loosened and tensioner nut tightened until there is between 0.75 - 1 inch / 1.9 - 2.5 cm of gap
Warning: Do not over tighten the track. Over tightening the track will cause the machine to lose power during operation
Jam nut tightened
3 Monthly Emergency Power System Test
Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls
At the ground controls, break the security tie and lift the emergency power switch cover (if equipped)
Simultaneously hold the emergency power switch on and operate each boom function through a partial cycle. All boom functions operate
Close the emergency power switch cover and secure the cover with a security tie (if equipped)
Turn the key switch to platform controls
At the platform controls, break the security tie and lift the emergency power switch cover (if equipped)
Press down on the foot switch and simultaneously hold the emergency power switch on and operate each boom function through a partial cycle. All boom functions operate
Close the emergency power switch cover and secure the cover with a security tie (if equipped)
Sign off on the emergency power system test
3 Monthly Safety Envelope Limit Switches And Angle Sensor Check
- Check the Safety Envelope Limit Switches and Angle Sensor - S-60X, S-60XC and S-80X
Testing the safety envelope system regularly is essential to safe machine operation. Continued use of an improperly operating safety envelope could result in the system not restricting the range of motion. Machine stability could be compromised resulting in the machine tipping over
Note: Perform this procedure with the machine on a firm, level surface with all weight, tools and equipment removed from the platform
Note: Start this procedure with the boom fully retracted and in the stowed position
Ground controls:
1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position
2. Start the engine from the ground controls
3. Turn and hold the function enable switch to the restricted maximum platform capacity and raise the primary boom until it is fully elevated
4. Extend the primary boom until it is fully extended
Access the parts list for your equipment in MaintainX.
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX