The Genie Articulated Boom Lift SX-150 is a versatile and powerful aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it a reliable choice for contractors and maintenance professionals.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift SX-150

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift SX-150

Genie Articulated Boom Lift SX-150

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model SX-150

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Platform Self-Leveling Test

Check mark

Test the Platform Self-leveling

Check mark

Lower the boom to the stowed position at the ground controls

Check mark

Activate function enable and adjust the platform to a level position

Check mark

Raise and lower the primary boom through a full cycle

Check mark

Enter the degree of deviation from level position

Check mark

The platform remained level at all times to within +/-5 degrees

Check mark

Sign off on the platform self-leveling test

Run this procedureArrow right

3 Monthly Safety Envelope And Circuit Test

Check mark

- Test the Safety Envelope and Circuits - Z-80/60

Check mark

Testing the machine safety envelope is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability is compromised and may tip over

Check mark

For limit switch and angle sensor information, Refer to appropriate Service and Repair Manual for your machine

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Secondary Boom #1 Angle Safety Limit Switch, LSS2AS

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

2. Start the engine from the ground controls

Check mark

3. Press the (plus)(minus) buttons on the LCD screen to activate status mode

Check mark

4. Press the enter or previous button on the LCD screen until secondary boom length is displayed

Run this procedureArrow right

50 Hourly Track Tension and Fastener Torque Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Track assembly cleaned of any dirt, rocks, clay, etc.

Check mark

Tracks chocked at one end of the machine to prevent rolling

Check mark

Machine lifted until the tracks are off the ground and jack stands placed under the drive chassis for support

Check mark

Visual inspection of the section of track under the bogey wheels completed

Check mark

Gap between the bogey wheels and the inside surface of the track

Check mark

Tensioner jam nut and idler axle bolts loosened and tensioner nut tightened until there is between 0.75 - 1 inch / 1.9 - 2.5 cm of gap

Check mark

Warning: Do not over tighten the track. Over tightening the track will cause the machine to lose power during operation

Check mark

Jam nut tightened

Run this procedureArrow right

3 Monthly Emergency Power System Test

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls

Check mark

At the ground controls, break the security tie and lift the emergency power switch cover (if equipped)

Check mark

Simultaneously hold the emergency power switch on and operate each boom function through a partial cycle. All boom functions operate

Check mark

Close the emergency power switch cover and secure the cover with a security tie (if equipped)

Check mark

Turn the key switch to platform controls

Check mark

At the platform controls, break the security tie and lift the emergency power switch cover (if equipped)

Check mark

Press down on the foot switch and simultaneously hold the emergency power switch on and operate each boom function through a partial cycle. All boom functions operate

Check mark

Close the emergency power switch cover and secure the cover with a security tie (if equipped)

Check mark

Sign off on the emergency power system test

Run this procedureArrow right

3 Monthly Safety Envelope Limit Switches And Angle Sensor Check

Check mark

- Check the Safety Envelope Limit Switches and Angle Sensor - S-60X, S-60XC and S-80X

Check mark

Testing the safety envelope system regularly is essential to safe machine operation. Continued use of an improperly operating safety envelope could result in the system not restricting the range of motion. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Perform this procedure with the machine on a firm, level surface with all weight, tools and equipment removed from the platform

Check mark

Note: Start this procedure with the boom fully retracted and in the stowed position

Check mark

Ground controls:

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position

Check mark

2. Start the engine from the ground controls

Check mark

3. Turn and hold the function enable switch to the restricted maximum platform capacity and raise the primary boom until it is fully elevated

Check mark

4. Extend the primary boom until it is fully extended

Run this procedureArrow right

Parts for Genie Articulated Boom Lift SX-150

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets