The Genie Articulated Boom Lift S80 is a versatile aerial work platform designed for optimal reach and maneuverability. Ideal for construction and maintenance tasks, this robust lift offers exceptional performance and reliability, making it a preferred choice for professionals in various industries. Experience enhanced productivity with the S80's advanced features and engineering.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift S80

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift S80

Genie Articulated Boom Lift S80

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model S80

Integrate maintenance plans directly into your work orders in MaintainX.

50 Hourly Extendable Axles Lubrication

Check mark

- Grease the Extendable Axles - S-100, S-105, S-120, S-125, S100HD and S-120HD

Check mark

Manufacturer specifications require that this procedure be performed every 50 hours

Check mark

Lubricating the front and rear axles helps to ensure the smooth operation of the axles over the lifetime of the product; Two fittings on each axle are provided to apply grease the top and bottom sliding wear pads

Check mark

1. Locate the grease fittings on the extendable axles covers

Check mark

2. Thoroughly pump grease into each grease fitting. When grease is pumped into each fitting, a hose directs this lubrication to the top or bottom wear pad

Check mark

3. Cycle the extending axles in and out

Check mark

Note: Genie recommends that the extending axles be cycled in and out at least once a week;

Run this procedureArrow right

3 Monthly Secondary Boom Angle Sensor Test

Check mark

- Test Secondary Boom Angle Sensor - Z-135/70 and ZX-135/70

Check mark

A properly functioning secondary boom angle sensor is essential to safe machine operation. The ECM at the ground controls (TCON) monitors the position and angle of the secondary boom using the signal from the secondary boom angle sensor

Check mark

The secondary boom angle sensor signal is used to control the ramping of the secondary boom

Check mark

Note:The turntable level sensor must be tested before starting this procedure. Refer to Maintenance Procedure, Test the Turntable Level Sensor

Check mark

Note: A digital level will be required to perform this procedure

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration. Refer to the manufactures calibration information

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Run this procedureArrow right

3 Monthly Platform Self-Leveling Test

Check mark

Test the Platform Self-leveling

Check mark

Lower the boom to the stowed position at the ground controls

Check mark

Activate function enable and adjust the platform to a level position

Check mark

Raise and lower the primary boom through a full cycle

Check mark

Enter the degree to which the platform remained level

Check mark

The platform remained level at all times to within +/-5 degrees

Check mark

Sign off on the platform self-leveling test

Run this procedureArrow right

2000 Hourly Free-Wheel Configuration Check

Check mark

- Check the Free-wheel Configuration

Check mark

Proper use of the free-wheel configuration is essential to safe machine operation. The free-wheel configuration is used primarily for towing. A machine configured to free-wheel without operator knowledge may cause death or serious injury and property damage

Check mark

Models with 2 wheel steer will be referenced with Non-steer and steer wheels

Check mark

Models with 4 wheel steer will be referenced with Circle-end and Square-end wheels

Check mark

WARNING!

Check mark

Collision hazard. Select a work site that is firm and level

Check mark

NOTICE:

Check mark

Component damage hazard. If the machine must be towed, do not exceed 2 mph / 3.2 km/h

Check mark

Non-steer or Circle-end wheels:

Run this procedureArrow right

2000 Hourly / 3 Monthly Hydraulic Oil Maintenance

Check mark

- Inspect Visually of the Hydraulic Oil

Check mark

Replacement or testing of the hydraulic oil is essential for good machine performance and service life

Check mark

Dirty oil and a clogged suction strainer may cause the machine to perform poorly and continued use may cause component damage

Check mark

Extremely dirty conditions may require oil changes to be performed more often. For hydraulic oil specifications, Refer to Specifications, Hydraulic Specifications

Check mark

Note: Before replacing the hydraulic oil, the oil may be tested by an oil distributor for specific levels of contamination to verify that changing the oil is necessary

Check mark

Replace the oil when it fails the test Refer to Maintenance Procedure, Test or Replace the Hydraulic Oil

Check mark

1. Collect a sample of hydraulic oil and place in a clear container. Visually inspect the hydraulic oil for the following:

Check mark

1) Color: oil should be a clear, light-honey colored

Check mark

2) Appearance, oil should be clear and not cloudy or visibly distorts the view through the sight glass or container

Run this procedureArrow right

Parts for Genie Articulated Boom Lift S80

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets