Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Flowserve Pump MK3 HSI 1.5×1-6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Pump Shaft Rotation
2.4 Storage
Store the pump in a clean, dry location away from vibration.
Leave flange covers in place to keep dirt and other foreign material out of pump casing.
Turn the pump shaft at regular intervals to prevent brinelling of the bearings and the seal faces, if fitted, from sticking.
Is the pump stored for more than 6 months?
Ensure protection of the pump after unpacking.
Has oil been added to the bearing housing?
Are inhibitor oils and greases used if units are idle for extended periods after addition of lubricants?
Rotate the pump shaft approximately 10 revolutions every three months.
3 Monthly Bearing Re-Lubrication
Pre-Lubrication Safety Measures
Stop the pump and lock the motor
Remove the coupling guard
Temperature Verification
Measure the external housing temperature
Is the external housing temperature within the safe range (below 94°C/200°F)?
Bearing Re-Lubrication
Remove the pipe plug from bearing locations
Enter the amount of grease for Group 2 inboard bearing
Pump Overhaul Inspection
6.8 Examination of parts
Ensure all parts are thoroughly cleaned and inspected
Use new bearings, O-rings, gaskets, and lip seals
List any parts showing wear or corrosion that were replaced
Measure shaft runout (should be 0.025 mm or less)
Is radial deflection within acceptable limits (0.05 mm or less)?
Measure axial shaft movement (endplay) on Durco pump (should be 0.03 mm or less)
Measure seal chamber face squareness run-out (should be less than 0.08 mm)
Measure seal chamber register concentricity (should be less than 0.13 mm)
6 Monthly Bearing Housing Oil Change
Oil Bath Lubrication Intervals
Is the bearing housing operating temperature under 71°C (160°F)?
Is mineral oil lubricant being used?
Enter the maximum external housing temperature observed
Enter the maximum temperature the bearing was exposed to
Oil Specifications and Recommendations
Verify oil specifications
Select the recommended lubricant used
Oil Filling Procedure
6 Weekly Bearing Housing Oil Change
Lubrication Intervals
Record the bearing housing operating temperature in °C
Is the bearing housing operating temperature within the specified range?
Record the external housing temperature in °C
Is the external housing temperature within the maximum limit of 82°C (180°F)?
Oil Specifications and Preparation
Verify oil specifications
Select the recommended lubricant used
Oil Change Procedure
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX