MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Pump 14-MFV-24

Need answers fast?
Explore the manual using AI.

Flowserve Pump 14-MFV-24
Flowserve Pump 14-MFV-24

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Pump 14-MFV-24

Flowserve Pump 14-MFV-24

Create an account to install this asset package.

Maintenance Plans for Flowserve Pump Model 14-MFV-24

Integrate maintenance plans directly into your work orders in MaintainX.

Shaft Sleeve Maintenance

Check mark

Shaft Sleeve Removal

Check mark

Verify heating requirements for shaft sleeve removal

Check mark

Was the sleeve successfully removed after heating to 230 °C (450 °F)?

Check mark

Was the sleeve successfully removed after heating to 260 °C (500 °F) and dousing with cold water?

Check mark

Was the sleeve cut off successfully?

Check mark

Mounting of Shaft Sleeve

Check mark

Clean the shaft and shaft sleeve thoroughly

Check mark

Remove oil or grease from mating surfaces with a non-toxic solvent

Check mark

Did the solvent dry completely before applying adhesive?

Run this procedureArrow right

Shaft Inspection

Check mark

6.1.7 Maintenance of shaft and shaft sleeve

Check mark

Examine the shaft condition at the following locations

Check mark

Is there any rusting or pitting on the shaft?

Check mark

Are the anti-friction bearings properly fitted to the pump shaft?

Check mark

Is there any distortion in the shaft keyways?

Check mark

Is the impeller loose on the shaft?

Check mark

Is the shaft bent or distorted?

Check mark

Is the wear on the shaft slight enough for repair by metal spraying or plating?

Check mark

Measure the shaft runout after repair (maximum 0.051 mm T.I.R.)

Run this procedureArrow right

Pump Temperature Check

Check mark

Normal Vibration Levels, Alarm and Trip

Check mark

Measure the vibration velocity of the motor (0.75–7.5 kW)

Check mark

Measure the vibration velocity of the motor (7.5–75 kW)

Check mark

Measure the vibration velocity of the motor (75–298 kW)

Check mark

Measure the vibration velocity of the motor (298–750 kW)

Check mark

Is the vibration velocity within the normal range?

Check mark

Is the vibration velocity above the alarm level?

Check mark

Is the vibration velocity above the trip level?

Check mark

Pump and Motor Bearings Temperature

Run this procedureArrow right

6 Monthly Pump Periodic Inspection

Check mark

6.1.2 Periodic inspection (semi-annual)

Check mark

Check the stuffing box

Check mark

Clean and oil the gland studs and nuts

Check mark

Replace the packing if excessive leakage cannot be reduced by gland adjustment

Check mark

Enter the pump running hours from records

Check mark

Should the bearings be inspected and re-lubricated based on hourly usage?

Check mark

Has it been more than one year since the last cleaning and lubrication change?

Check mark

Check foundation bolts

Check mark

Does the bearing lubricant require changing based on hourly usage?

Run this procedureArrow right

300 Hourly Pump Bearing Lubrication

Check mark

Recommended Grease Fill Quantities

Check mark

Verify re-lubrication interval and quantities for frames

Check mark

Grease Lubrication Procedure

Check mark

Connect grease gun to the nipple

Check mark

Press grease into the bearing housing until the first signs of it appear in the gap between the housing and shaft, then stop greasing

Check mark

Record the operating temperature of the bearing housing

Check mark

Is the temperature rise above ambient within 55 °C (131 °F) or a combined maximum of 95 °C (204 °F)?

Check mark

Is there a continuously rising temperature or an abrupt temperature rise?

Check mark

Stop the pump immediately if temperature issues are detected and investigate the cause

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets