MaintainX Asset Hub logo
EnterprisePricing
Doosan

Doosan Compressor 25/300

Need answers fast?
Explore the manual using AI.

Doosan Compressor 25/300
Doosan Compressor 25/300

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Compressor 25/300

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Compressor 25/300

Doosan Compressor 25/300

Create an account to install this asset package.

Maintenance Plans for Doosan Compressor Model 25/300

Integrate maintenance plans directly into your work orders in MaintainX.

12 Monthly Fresh Mixture Replenish

Check mark

WARNING: Do not remove the cap from a HOT engine radiator. The sudden release of pressure from a heated cooling system can result in serious personal injury.

Check mark

The engine cooling system is filled at the factory with a 50/50 mixture of water and ethylene glycol. This permanent type antifreeze contains rust inhibitors and provides protection to --35° F (--37°C).

Check mark

The use of such a mixture is recommended for both summer and winter operation. When using water alone, be sure to add a reputable brand of rust inhibitor to prevent internal corrosion.

Check mark

It is recommended to test the freezing protection of the coolant every six months or prior to freezing temperatures. Replenish with a fresh mixture every twelve months. A drain for the system is located in the bottom radiator tank. An alternate method would be to disconnect a bottom radiator hose.

Check mark

Engine radiator cap removed safely?

Check mark

Cooling system filled with 50/50 mixture of water and ethylene glycol?

Check mark

Rust inhibitor added when using water alone?

Check mark

Enter the freezing protection of the coolant

Check mark

Fresh mixture replenished?

Run this procedureArrow right

2000 Hourly/12 Monthly Compressor Maintenance

Check mark

Shutdown Switch Settings check

Check mark

Scavenge Orifice & related parts check

Check mark

Oil Separator Element clean

Check mark

Wheels (bearings, seals, etc) check

Check mark

Engine Coolant replace

Check mark

Sign off on the compressor maintenance

Run this procedureArrow right

1 Monthly Compressor Oil Cooler Maintenance

Check mark

Warning: Ensure the compressor is turned off and cooled down before starting the maintenance.

Check mark

Check for grease, oil and dirt accumulation on the exterior surfaces of the oil cooler.

Check mark

If accumulation is present, proceed with the following steps.

Check mark

Upload a photo of the oil cooler before cleaning.

Check mark

Clean the oil cooler by directing compressed air containing a nonflammable safety solvent through the core.

Check mark

Upload a photo of the oil cooler after cleaning.

Check mark

Check for foreign deposits such as sludge and lacquer in the oil cooler.

Check mark

If foreign deposits are present, proceed with the following steps.

Check mark

Enter the name of the cleaning compound used.

Run this procedureArrow right

1 Monthly Hoses Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

All intake lines to and from the air cleaners inspected

Check mark

Engine cooling system hoses inspected

Check mark

All flexible hoses used for air, oil, and fuel inspected

Check mark

All rubber hose joints and screw-type hose clamps are tight

Check mark

No signs of wear or deterioration on hose connections

Check mark

No dust-laden air entering the engine’s combustion chamber or the compressor intake

Check mark

No signs of wear and deterioration on flexible hoses used in the fuel, oil and air lines

Check mark

All clamps replaced if missing

Run this procedureArrow right

Initial 200 Miles Electric Brake Adjustment

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Trailer secured on adequate capacity jack stands

Check mark

Wheel and drum rotate freely

Check mark

Adjusting hole cover removed from the adjusting slot on the bottom of the brake backing plate

Check mark

Brake shoes expanded until the pressure of the linings against the drum makes the wheel very difficult to turn

Check mark

Starwheel rotated in the opposite direction until the wheel turns freely with a slight lining drag

Check mark

Adjusting hole cover replaced and wheel lowered to the ground

Check mark

Repeat above procedures on all brakes

Check mark

Sign off on the brake adjustment

Run this procedureArrow right

Parts for Doosan Compressor 25/300

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Electric Brake Kit

36088799

Electric Brake Kit

36088799

Electric Brake Kit

36088799

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets