

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Doosan Compressor 25/300
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
12 Monthly Fresh Mixture Replenish
WARNING: Do not remove the cap from a HOT engine radiator. The sudden release of pressure from a heated cooling system can result in serious personal injury.
The engine cooling system is filled at the factory with a 50/50 mixture of water and ethylene glycol. This permanent type antifreeze contains rust inhibitors and provides protection to --35° F (--37°C).
The use of such a mixture is recommended for both summer and winter operation. When using water alone, be sure to add a reputable brand of rust inhibitor to prevent internal corrosion.
It is recommended to test the freezing protection of the coolant every six months or prior to freezing temperatures. Replenish with a fresh mixture every twelve months. A drain for the system is located in the bottom radiator tank. An alternate method would be to disconnect a bottom radiator hose.
Engine radiator cap removed safely?
Cooling system filled with 50/50 mixture of water and ethylene glycol?
Rust inhibitor added when using water alone?
Enter the freezing protection of the coolant
Fresh mixture replenished?
2000 Hourly/12 Monthly Compressor Maintenance
Shutdown Switch Settings check
Scavenge Orifice & related parts check
Oil Separator Element clean
Wheels (bearings, seals, etc) check
Engine Coolant replace
Sign off on the compressor maintenance
1 Monthly Compressor Oil Cooler Maintenance
Warning: Ensure the compressor is turned off and cooled down before starting the maintenance.
Check for grease, oil and dirt accumulation on the exterior surfaces of the oil cooler.
If accumulation is present, proceed with the following steps.
Upload a photo of the oil cooler before cleaning.
Clean the oil cooler by directing compressed air containing a nonflammable safety solvent through the core.
Upload a photo of the oil cooler after cleaning.
Check for foreign deposits such as sludge and lacquer in the oil cooler.
If foreign deposits are present, proceed with the following steps.
Enter the name of the cleaning compound used.
1 Monthly Hoses Maintenance
Warning: This maintenance check requires trained personnel with PPE!
All intake lines to and from the air cleaners inspected
Engine cooling system hoses inspected
All flexible hoses used for air, oil, and fuel inspected
All rubber hose joints and screw-type hose clamps are tight
No signs of wear or deterioration on hose connections
No dust-laden air entering the engine’s combustion chamber or the compressor intake
No signs of wear and deterioration on flexible hoses used in the fuel, oil and air lines
All clamps replaced if missing
Initial 200 Miles Electric Brake Adjustment
Warning: This procedure requires trained personnel with PPE!
Trailer secured on adequate capacity jack stands
Wheel and drum rotate freely
Adjusting hole cover removed from the adjusting slot on the bottom of the brake backing plate
Brake shoes expanded until the pressure of the linings against the drum makes the wheel very difficult to turn
Starwheel rotated in the opposite direction until the wheel turns freely with a slight lining drag
Adjusting hole cover replaced and wheel lowered to the ground
Repeat above procedures on all brakes
Sign off on the brake adjustment
Access the parts list for your equipment in MaintainX.
Electric Brake Kit
36088799
Electric Brake Kit
36088799
Electric Brake Kit
36088799
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













