

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Doosan Portable Light Tower L6-60HZ-T4F
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1000 Hourly Light Tower Service
Starter - Inspect
Alternator - Inspect
Bolts and nuts on the engine - Retighten
50 Hourly/1 Yearly Air Cleaner Service
Fuel Tank Service
Fuel Tank - Drain Water
Water Sedimenter Service
Is water sedimenter installed?
If water sedimenter is installed, drain water every 500 service hours or 1 year
Sign off on the air cleaner service
250 Hourly/3 Monthly Light Tower Maintenance
1. Air Cleaner Housing Check
The Air Cleaner Assembly (housing) should be inspected every three months or 500 hours for any leakage paths.
NOTE: Ensure the inlet is free from obstruction.
Ensure the air cleaner mounting bolts and clamps are tight and the air cleaner is mounted securely. Check the air cleaner housing for dents or damage to the cleaner which could lead to a leak.
2. Fuel/Water Separator Element Check
1 Weekly Tower Inspection
1. Tower Cables
Each week the tower lifting cables should be inspected to ensure the ends are attached securely. The cables should be checked for fraying or other damage and replaced if damaged. Also, the pulleys should be checked for unusual wear or damage and replaced if worn excessively or damaged.
2. Tower Locking Pins
All tower locking pins should be checked weekly. Replace any missing or damaged pins before lifting the unit or raising the tower.
1 Weekly Light Tower Maintenance
1. Air cleaner element - Clean, Check, Replace
Proper maintenance of the air cleaner provides maximum protection against airborne dust.
Squeeze the rubber valve (Precleaner Dirt Dump) periodically to ensure that it is not clogged.
To service the air cleaners, proceed as follows:
1.1. Remove Filter element.
1.2. Inspect Air Cleaner housing for any condition that might cause a leak. Correct as necessary.
1.3. Wipe inside of Air Cleaner housing with a clean, damp cloth to remove any dirt accumulation to allow a better seal for Filter element gasket.
1.4. Install Filter element.
2. Fuel system - Bleed air
Access the parts list for your equipment in MaintainX.
Filter Kit 250 Hours - LSCWKUB
46618979
Filter Kit 500 Hours - LSCWKUB
46618980
Filter Kit 250 Hours - LSCWKUB
46618979
Filter Kit 500 Hours - LSCWKUB
46618980
Filter Kit 250 Hours - LSCWKUB
46618979
Filter Kit 500 Hours - LSCWKUB
46618980
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













