MaintainX Asset Hub logo
EnterprisePricing
Doosan

Doosan Portable Light Tower LS-60HZ-T4F

Need answers fast?
Explore the manual using AI.

Doosan Portable Light Tower LS-60HZ-T4F
Doosan Portable Light Tower LS-60HZ-T4F

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Portable Light Tower LS-60HZ-T4F

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Portable Light Tower LS-60HZ-T4F

Doosan Portable Light Tower LS-60HZ-T4F

Create an account to install this asset package.

Maintenance Plans for Doosan Portable Light Tower Model LS-60HZ-T4F

Integrate maintenance plans directly into your work orders in MaintainX.

250 Hourly Light Tower Service

Check mark

Engine oil and Oil filter - Replace

Check mark

Belt and belt tension - Inspect and Adjust

Check mark

Radiator fins - Check and Clean

Check mark

Sign off on the light tower service

Run this procedureArrow right

1 Daily Light Tower Maintenance

Check mark

Check for evidence of arcing around the electrical terminals.

Check mark

Check for loose wire routing clamps. Clamps must be secure and properly mounted. Also check wiring for wear, deterioration, and vibration abrasion.

Check mark

Check engine oil and coolant level.

Check mark

Check that the grounding circuit is in accordance with the National Electric Code Article 250 and the local code requirements. As a minimum, the wire size should be American Wire Gauge 8 (AWG#8) from the grounding terminal, when required. Check to ensure continuity between the grounding terminal, frame, generator, and engine block.

Check mark

Inspect the instrument lamps, gauges, and switches prior to start-up and during operation to ensure proper functioning.

Check mark

Check for loose or frayed wiring insulation or sleeving.

Check mark

Inspect tower cables for damaged areas.

Check mark

Clean the air vents of any obstructions or debris.

Check mark

Check for water in the fuel filter/water separator unit. Some engines have a translucent bowl for visual inspection and others have a drain valve below the primary element.

Run this procedureArrow right

Light Tower Maintenance

Check mark

1. Exterior Finish - as needed

Check mark

This unit was painted and heat cured at the factory with a high quality, thermoset polyester powder coating. The following care will ensure the longest possible life from this finish.

Check mark

1.1. If necessary to remove dust, pollen, etc. from housing, wash with water and automotive shampoo or mild dish washing liquid detergent. Do not scrub with a rough cloth, pad, etc.

Check mark

1.2. To remove grease, a fast evaporating alcohol or chlorinated solvent can be used. Note: This may cause some dulling of the paint finish.

Check mark

1.3. If the paint has faded or chalked, the use of a commercial grade, non-abrasive car wax may partially restore the color and gloss.

Check mark

2. Engine - Refer to Engine Operator Manual

Check mark

3. Decals - Replace decals if removed, damaged or missing

Run this procedureArrow right

1 Weekly Tower Inspection

Check mark

1. Tower Cables

Check mark

Each week the tower lifting cables should be inspected to ensure the ends are attached securely. The cables should be checked for fraying or other damage and replaced if damaged. Also, the pulleys should be checked for unusual wear or damage and replaced if worn excessively or damaged.

Check mark

2. Tower Locking Pins

Check mark

All tower locking pins should be checked weekly. Replace any missing or damaged pins before lifting the unit or raising the tower.

Run this procedureArrow right

1000 Hourly Light Tower Service

Check mark

Starter - Inspect

Check mark

Alternator - Inspect

Check mark

Bolts and nuts on the engine - Retighten

Run this procedureArrow right

Parts for Doosan Portable Light Tower LS-60HZ-T4F

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Filter Kit 250 Hours - LSCWKUB

46618979

Filter Kit 500 Hours - LSCWKUB

46618980

Filter Kit 250 Hours - LSCWKUB

46618979

Filter Kit 500 Hours - LSCWKUB

46618980

Filter Kit 250 Hours - LSCWKUB

46618979

Filter Kit 500 Hours - LSCWKUB

46618980

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets