MaintainX Asset Hub logo
EnterprisePricing
Doosan

Doosan Portable Light Tower L6-60HA-T4F

Need answers fast?
Explore the manual using AI.

Doosan Portable Light Tower L6-60HA-T4F
Doosan Portable Light Tower L6-60HA-T4F

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Portable Light Tower L6-60HA-T4F

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Portable Light Tower L6-60HA-T4F

Doosan Portable Light Tower L6-60HA-T4F

Create an account to install this asset package.

Maintenance Plans for Doosan Portable Light Tower Model L6-60HA-T4F

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Light Tower Maintenance

Check mark

Engine Radiator (exterior) Check

Check mark

Check the coolant level in the radiator. The coolant must cover the tubes in the top tank (approximately 1 inch high on a clean measuring rod, stuck down filler neck).

Check mark

Air Intake Hoses and Flexible Hoses Check

Check mark

All rubber hose joints and the screw type hose clamps must be tight and the hoses showing no signs of wear, abrasion, or deterioration.

Check mark

All flexible hoses must be free of wear, deterioration, and vibration abrasion. Routing clamps must be properly mounted and secure.

Check mark

Fasteners (tighten) Check

Check mark

Monthly spot check several capscrews and nuts for proper torque. If any are found loose, a more thorough inspection must be made and deficiencies corrected.

Check mark

Engine Protection Shutdown System Check

Check mark

The operation of the Engine Protection Shutdown System should be checked every month or whenever it appears not to be operating properly. The three switches involved in this protective shutdown system are the Engine Coolant High Temperature Switch, the Engine Oil Pressure Switch and the Low Fuel Switch.

Run this procedureArrow right

Initial 50 Hours Engine Service

Check mark

Solenoid Fuel Pump Filter - Inspect and Clean (Note: N/A LSC and LS)

Check mark

Engine oil and Oil filter - Replace

Check mark

Bolts and nuts on the engine - Retighten

Run this procedureArrow right

1 Weekly Tower Inspection

Check mark

1. Tower Cables

Check mark

Each week the tower lifting cables should be inspected to ensure the ends are attached securely. The cables should be checked for fraying or other damage and replaced if damaged. Also, the pulleys should be checked for unusual wear or damage and replaced if worn excessively or damaged.

Check mark

2. Tower Locking Pins

Check mark

All tower locking pins should be checked weekly. Replace any missing or damaged pins before lifting the unit or raising the tower.

Run this procedureArrow right

250 Hourly Light Tower Service

Check mark

Engine oil and Oil filter - Replace

Check mark

Belt and belt tension - Inspect and Adjust

Check mark

Radiator fins - Check and Clean

Check mark

Sign off on the light tower service

Run this procedureArrow right

Generator Set Cleaning

Check mark

Cleaning Instructions (General)

Check mark

Keeping the generator set clean of any oil and dirt is recommended for both appearance and maximum service life of the equipment. The frequency of cleaning will be dependent on local conditions and the severity and frequency of operation.

Check mark

NOTE: Do not use high pressure water, steam, or solvent on the exterior finish of the unit housing.

Check mark

Is the generator set free of oil and dirt?

Check mark

Select the cleaning method used

Check mark

Note any areas that are difficult to clean or require special attention

Check mark

Sign off on the generator set cleaning

Run this procedureArrow right

Parts for Doosan Portable Light Tower L6-60HA-T4F

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Filter Kit 250 Hours - LSCWKUB

46618979

Filter Kit 500 Hours - LSCWKUB

46618980

Filter Kit 250 Hours - LSCWKUB

46618979

Filter Kit 500 Hours - LSCWKUB

46618980

Filter Kit 250 Hours - LSCWKUB

46618979

Filter Kit 500 Hours - LSCWKUB

46618980

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets