MaintainX Asset Hub logo
EnterprisePricing
Doosan

Doosan Compressor 25/280

Need answers fast?
Explore the manual using AI.

Doosan Compressor 25/280
Doosan Compressor 25/280

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Compressor 25/280

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Compressor 25/280

Doosan Compressor 25/280

Create an account to install this asset package.

Maintenance Plans for Doosan Compressor Model 25/280

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Protection Coolant Check

Check mark

WARNING: Do not remove the cap from a HOT engine radiator. The sudden release of pressure from a heated cooling system can result in serious personal injury.

Check mark

The engine cooling system is filled at the factory with a 50/50 mixture of water and ethylene glycol. This permanent type antifreeze contains rust inhibitors and provides protection to --35° F (--37°C).

Check mark

The use of such a mixture is recommended for both summer and winter operation. When using water alone, be sure to add a reputable brand of rust inhibitor to prevent internal corrosion.

Check mark

It is recommended to test the freezing protection of the coolant every six months or prior to freezing temperatures. Replenish with a fresh mixture every twelve months. A drain for the system is located in the bottom radiator tank. An alternate method would be to disconnect a bottom radiator hose.

Check mark

Is the engine cool?

Check mark

Is the coolant mixture 50/50 water and ethylene glycol?

Check mark

Is the coolant providing protection to --35° F (--37°C)?

Check mark

Is rust inhibitor added when using water alone?

Check mark

Is the freezing protection of the coolant tested every six months or prior to freezing temperatures?

Run this procedureArrow right

1 Monthly Compressor Oil Cooler Maintenance

Check mark

Warning: Ensure the compressor is turned off and cooled down before starting the maintenance.

Check mark

Check for grease, oil and dirt accumulation on the exterior surfaces of the oil cooler.

Check mark

Upload a photo of the oil cooler before cleaning.

Check mark

Cleaning Procedure

Check mark

Clean the oil cooler by directing compressed air which contains a nonflammable safety solvent through the core of the oil cooler.

Check mark

Upload a photo of the oil cooler after cleaning.

Check mark

Check for foreign deposits, such as sludge and lacquer, in the oil cooler.

Check mark

If foreign deposits are found:

Check mark

Clean the oil cooler using a cleaning compound in accordance with the manufacturer’s recommendations.

Run this procedureArrow right

Initial 200 Miles Electric Brake Adjustment

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Trailer secured on adequate capacity jack stands

Check mark

Wheel and drum rotate freely

Check mark

Adjusting hole cover removed from the adjusting slot on the bottom of the brake backing plate

Check mark

Brake shoes expanded until the pressure of the linings against the drum makes the wheel very difficult to turn

Check mark

Starwheel rotated in the opposite direction until the wheel turns freely with a slight lining drag

Check mark

Adjusting hole cover replaced and wheel lowered to the ground

Check mark

Repeat above procedures on all brakes

Check mark

Sign off on the brake adjustment

Run this procedureArrow right

1 Weekly Compressor Maintenance

Check mark

Hydraulic Oil Level Check

Check mark

Battery Connections/Electrolyte Check

Check mark

Tire Pressure and Surface Check

Run this procedureArrow right

6 Monthly Parking Brakes Maintenance

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Brake shoes visually checked for proper operation and deterioration

Check mark

Procedure for replacing brake cables and adjusting brake shoes

Check mark

Brake shoes adjusted

Check mark

Rubber hole plug in the brake backing plate replaced

Check mark

Procedure for adjusting parking brakes

Check mark

Knob on brake lever turned until lever is perpendicular to bracket when in “OFF” position

Check mark

Brake cables adjusted until each has approximately the same tension

Check mark

Brake lever moved to “ON” position and each wheel checked to see that it will not rotate

Run this procedureArrow right

Parts for Doosan Compressor 25/280

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Electric Brake Kit

36088799

Electric Brake Kit

36088799

Electric Brake Kit

36088799

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets