Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Continental Tumble Dryer KT120E
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Fire Suppression System Check
Preparation
Inform the fire department about the upcoming maintenance test
Disconnect auxiliary output if it activates a building sprinkler
Auxiliary Alarm Check
Verify the connection to the auxiliary output through the H-4 header connection
Check the relay rating (5 Amp, 250VAC max)
System Activation Test
Did the auxiliary output activate during the test sequence?
Verify auxiliary output functions
Gas Valve Governor/Regulator Adjustment
Preparation
Ensure the following tools are available
Refer to Figure 13 for guidance
Pressure Check
Remove screw plug from pressure tap
Connect a U-tube manometer to the burner orifice pressure tap
Start tumble dryer and observe pressure once flame is burning
Regulator Adjustment
Remove regulator cap
1 Daily Gas Leak Inspection
Safety Precautions
Ensure no open flames are present in the inspection area
Use non-corrosive leak detection fluid
Inspection of Pipe Connections
Check all pipe connections for gas leaks
Was any gas leak detected?
Post Inspection
Was the inspection completed without any issues?
Describe any issues found during inspection
Natural Gas G20 Or G25 Manifold Pressure Adjustment
Preparation
Affix appropriate country/gas category label if required
Gas Supply Pressure Verification
Enter the current gas supply pressure
Is the gas supply pressure within the normal range?
Manifold Pressure Verification and Adjustment
Enter the current manifold pressure
Is the manifold pressure within the normal range?
Adjust the gas valve governor/regulator as necessary
G30 or G31 Supply Pressure Adjustment
Preparation
Affix the appropriate country/gas category label over the main serial plate designations if required.
Pressure Verification and Adjustment
Enter the current gas supply pressure.
Is the gas supply pressure within the acceptable range?
Adjust the gas supply pressure if necessary.
Finalization
Refer to Figure 12 for guidance.
Technician's signature to confirm completion of the procedure.
Access the parts list for your equipment in MaintainX.
Cold Weather Fire Suppression System Relocation Kit
44340301
Inlet Hose 8.0 Feet
20617
Inlet Hose 10 Feet
20618
Blank Orifice
M400995
Burner Opening Cover
M413099
Cold Weather Fire Suppression System Relocation Kit
44340301
Inlet Hose 8.0 Feet
20617
Inlet Hose 10 Feet
20618
Blank Orifice
M400995
Burner Opening Cover
M413099
Cold Weather Fire Suppression System Relocation Kit
44340301
Inlet Hose 8.0 Feet
20617
Inlet Hose 10 Feet
20618
Blank Orifice
M400995
Burner Opening Cover
M413099
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX