Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Conair Thermolator Temperature Control Unit CC-9kW-208V
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Cooling and Process Lines Check
Inspection of Cooling and Process Lines
Inspect the following for leaks
Were any leaks detected during inspection?
Action on Leak Detection
Stop the Thermolator if a leak is detected
Describe the location and nature of the leak
Repair the leak
3 Monthly Unit Inspection
Inspection of Power Cords, Wires, and Electrical Connections
Inspect power cords, wires, and electrical connections for the following issues
Check exterior power cords for connection integrity
Check the ground wire and thermocouple connections
Replace any wire that appears damaged or has worn or cracked insulation
1 Daily Unit Cleaning
Unit and Surrounding Area Cleaning
Clean the unit and the area around it
Check and remove obstructions
Air Intake Area Maintenance
Inspect air intake areas for obstructions
Remove any obstructions found in air intake areas
Floor Maintenance
Is the floor around the unit dry?
1 Yearly Temperature Sensors Calibration
Enable Test Mode
Press any button to display the first test menu
Select the Calibration Mode menu
Release the Setpoint key
Apply the appropriate temperature to the control input using the thermocouple calibrator
Press the up ▲ key to begin calibrating
Wait until the control displays “don” or “bad”
Press Select to start the next calibration
Exit Calibration Mode
1 Yearly Unit Testing
Preparation for Test Mode
Shut down the Thermolator
Disconnect and lock out main power to the unit
Open the electrical enclosure
Set dip switches
Close the electrical enclosure
Restore power to the unit
Press any button to display the first test menu
Key/Display Test
Access the parts list for your equipment in MaintainX.
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX