Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Conair Thermolator Temperature Control Unit DI-18kW-230V
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Unit Cleaning
Unit and Surrounding Area Cleaning
Clean the unit and the area around it
Check and remove obstructions
Air Intake Area Maintenance
Inspect air intake areas for obstructions
Are the air intake areas clear of obstructions?
Floor Maintenance
Ensure the floor around the unit is dry
Heater Contactor Replacement
Preparation
Disconnect and lockout the main power
Open the electrical enclosure door by turning the screw on the front panel counterclockwise
Contactor Removal
Disconnect the wires from the heater contactor
Label the wires for correct reconnection
Remove the contactor by unscrewing it
Discard the old contactor using the proper disposal procedure
Contactor Installation
Pump Overload Replacement
Disconnect and lockout the main power
Open the electrical enclosure door
Turn the screw on the front panel counterclockwise to open
Locate the pump overload module attached to the pump motor starter
Disconnect the three power leads from the overload module to the pump motor
Note the placement of each lead and label as needed
Disconnect auxiliary wiring on the overload module
Remove the overload module
Loosen the three screws that connect the overload module to the motor contactor
Pump Disassembling
Impeller Removal
Remove the impeller retaining assembly
Insert a screwdriver in one of the impeller waterway passages to hold the impeller steady while removing the retainer
Remove the impeller, ensuring not to lose the key, spring, and seal retainer
Was a bearing puller needed to remove the impeller?
Seal and Adapter Removal
Remove the seal, adapter, shaft, and flinger
Refer to the exploded view for detail
Cleaning and Inspection
Motherboard Replacement
Power Supply Disconnection
Disconnect the main power supply
Lockout the main power supply
Accessing the Motherboard
Open the electrical enclosure door
Turn the screw on the front panel counterclockwise to open
Wire Labeling and Disconnection
Mark or label each wire connected to the motherboard
Ensure wires are labeled for correct terminal connection on new motherboard
Access the parts list for your equipment in MaintainX.
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













