Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ASCO Automatic Transfer Switch D300B370N1C
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Transfer Switch Contacts Check
Preparation
De-energize all sources
Inspection
Remove the transfer switch barriers
Check contact condition
Reinstallation
Reinstall the barriers carefully
1 Yearly Enclosure Cleaning
Preparation
De-energize all sources
Cleaning Process
Brush away excessive dust accumulation
Vacuum away excessive dust accumulation
Remove moisture with a clean cloth
Post-Cleaning Check
Is the enclosure free of dust and moisture?
1 Monthly Transfer Switch Testing
Press and hold the door-mounted Transfer Test button until the engine starts and runs
Verify engine starts and runs within 15 seconds
Check if the transfer switch operates to the Emergency position
If Transfer To Emergency Delay is used, verify transfer occurs after a time delay (up to 5 minutes)
Press Bypass Time Delay button for immediate transfer, if necessary
Verify the Transfer Switch operates back to the Normal position after the Retransfer To Normal Delay (up to 30 minutes)
Press Bypass Time Delay button for immediate retransfer, if necessary
Ensure Unloaded Running (Engine Cooldown) Delay allows engine to run unloaded for 5 minutes
Access the parts list for your equipment in MaintainX.
Castrol Endurex 4000 Lubricant.
625550–001
Programmable Engine Exerciser and Source Availability Contacts
K629830
Serial Communication Module
K601110
Strip Heater (120 Volt Customer Supplied Voltage)
K613127–001
Strip Heater (208 – 480 Volt ATS Derived Voltage)
K613127–002
Castrol Endurex 4000 Lubricant.
625550–001
Programmable Engine Exerciser and Source Availability Contacts
K629830
Serial Communication Module
K601110
Strip Heater (120 Volt Customer Supplied Voltage)
K613127–001
Strip Heater (208 – 480 Volt ATS Derived Voltage)
K613127–002
Castrol Endurex 4000 Lubricant.
625550–001
Programmable Engine Exerciser and Source Availability Contacts
K629830
Serial Communication Module
K601110
Strip Heater (120 Volt Customer Supplied Voltage)
K613127–001
Strip Heater (208 – 480 Volt ATS Derived Voltage)
K613127–002
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX