Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CAT Generator SR4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1000 Hourly / 1 Yearly Bearing Lubrication
This procedure is for the lubrication of spherical roller bearings and ball bearings.
Enter the current machine hour reading
Has the machine been operated for 1000 hours since the last spherical roller bearings lubrication?
Has the machine been operated for 2000 hours since the last ball bearings lubrication?
Has it been a year since the last lubrication?
If any of the above checks are 'PASS', proceed with the lubrication process.
Lubrication Process:
Has it been 3 years since the last grease replacement?
If 'PASS', proceed with grease replacement.
1 Weekly Generator Check
Warning: This maintenance check requires trained personnel with PPE!
Bearing Bracket Temperature
Main Stator Winding Temperature
Visual Inspection
Space Heaters
Cleaning
Looseness
Walk around
Check operation
1 Weekly Resistance Check
Warning: This procedure requires trained personnel with PPE!
Megohmmeter available for testing?
If megohmmeter is not available, report to the maintenance team and stop the procedure
Select the situation for testing
Enter the megohmmeter test reading
Is the test reading above one megohm?
Note down any issues found during the test
Sign off on the resistance check
3 Monthly Insulation Test
Warning: This test requires trained personnel with PPE!
Insulation test performed?
Enter the insulation resistance value (in megohms)
Is the insulation resistance value above the minimum threshold (1 megohm + rated V / 1000)?
Upload a photo of the Megger reading
Sign off on the insulation test
Bearing Inspection
The following maintenance procedure for generator bearings should be followed at every major engine overhaul:
1. Remove bearing bracket. Inspect the bracket bore and bearing outer race and rolling elements. Standby Power units should have the bearing inspected and the grease replaced every three years. The bearing bracket bore should be inspected for out of roundness, excessive wear, and a bracket step less than 0.0762 mm (.003 in).
The bearing should be inspected for outer race damage, severe fretting, and smoothness of operation. If possible, the bearing elements should be inspected. Some double shielded ball bearings prevent visual inspection of the ball bearing elements. Other double shielded ball bearings have a retaining ring, that can be removed, to allow access for a visual inspection of the ball bearing elements.
NOTE: Bearings being removed for failure analysis should not be cut off with a torch.
2. Spherical Roller Bearing should be cleaned and re- '@ packed with 108k3611 Grease Pack the bearing and cavity to one-third to one-half of the cavity volume. (Approximately 3 - 4 oz. in the bearing and 4 - 5 02. in the cavity.) Refer to the chart that follows.
3. All ball bearings should be cleaned and the bracket cavity re-packed with 2.5-3230 Grease. The cavity should be filled to one-third to one-half of the cavity volume. Refer to the chart that follows.
4. Make sure the grease supply tube to the bearing is filled with grease.
5. Remove the bracket drain plug and operate generator for one hour. This allows the grease to expand, forcing the excess grease out of the cavity reliei/ing the internal pressure. The generator should continue to operate until the grease stops purging. Grease may not purge until later grease intervals.
6. Stop the engine. Install the bracket drain plug and wipe off excess grease.
Access the parts list for your equipment in MaintainX.
Bearing OD 100mm (3.937") ID 45mm (1.772") Shield Type Double
5P-1977
Bearing OD 140mm (5.5118") ID 65mm (2.5591") Shield Type Double
3N-1965
Bearing OD 160mm (6.2992") ID 75mm (2.9527") Shield Type Double
5P-2448
Bearing OD 170mm (6.6929") ID 80mm (3.1496") Shield Type Double
109-7687
Bearing OD 170mm (6.6929") ID 80mm (3.1496") Shield Type Single
4L-6677
Bearing OD 100mm (3.937") ID 45mm (1.772") Shield Type Double
5P-1977
Bearing OD 140mm (5.5118") ID 65mm (2.5591") Shield Type Double
3N-1965
Bearing OD 160mm (6.2992") ID 75mm (2.9527") Shield Type Double
5P-2448
Bearing OD 170mm (6.6929") ID 80mm (3.1496") Shield Type Double
109-7687
Bearing OD 170mm (6.6929") ID 80mm (3.1496") Shield Type Single
4L-6677
Bearing OD 100mm (3.937") ID 45mm (1.772") Shield Type Double
5P-1977
Bearing OD 140mm (5.5118") ID 65mm (2.5591") Shield Type Double
3N-1965
Bearing OD 160mm (6.2992") ID 75mm (2.9527") Shield Type Double
5P-2448
Bearing OD 170mm (6.6929") ID 80mm (3.1496") Shield Type Double
109-7687
Bearing OD 170mm (6.6929") ID 80mm (3.1496") Shield Type Single
4L-6677
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX