Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Carbolite Gero Ashing Furnace VMF 10/6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Ashing Furnace Maintenance
General Maintenance
Remove soot deposits as mentioned in section 3.3
Clean the furnace outer surface with a damp cloth
Ensure no water enters the interior of the case or chamber
Avoid cleaning with organic solvents
Calibration
Check if the controller and/or thermocouple require recalibration after prolonged use
Perform a quick check using an independent thermocouple and temperature indicator
Record findings from the independent thermocouple and temperature indicator check
Solid-state Relay Replacement
Preparation
Disconnect the furnace from the supply
Remove the furnace back panel
Solid-state Relay Disconnection
Make a note of how the wires are connected to the solid state relay
Disconnect the wires from the solid state relay
Solid-state Relay Removal
Remove the solid state relay from the base panel or aluminium plate
Solid-state Relay Replacement
Power Adjustment
Pre-Adjustment Checks
Is the power limit parameter OP.Hi accessible to the operator?
Is the current power limit set to zero for demonstration purposes?
Power Adjustment
Ensure the power limit is not set higher than the design level.
Reset the power limit to its standard value if it was set to zero.
Post-Adjustment Verification
Is the power limit set to 100% over all common voltages?
Has the power limit been adjusted according to section 8.2 guidelines?
Thermocouple Replacement
Preparation
Disconnect the furnace from the supply
Remove the furnace back panel
Documentation
Note the thermocouple connections
Color Coding Reference
Verify thermocouple color coding
Disconnection
Disconnect the thermocouple from its terminal block
Element Replacement
Preparation
Wear a face mask
Disconnect the furnace
Disassembly
Remove the back panel
Make a plan of all the internal connections to the back of the heating chamber
Disconnect all internal connections
Remove the thermocouple(s) and support tube(s)
Insulation Box Removal
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX