MaintainX Asset Hub logo
EnterprisePricing
Carbolite Gero

Carbolite Gero Ashing Furnace OAF 11/2

Need answers fast?
Explore the manual using AI.

Carbolite Gero Ashing Furnace OAF 11/2
Carbolite Gero Ashing Furnace OAF 11/2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Carbolite Gero Ashing Furnace OAF 11/2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Carbolite Gero Ashing Furnace OAF 11/2

Carbolite Gero Ashing Furnace OAF 11/2

Create an account to install this asset package.

Maintenance Plans for Carbolite Gero Ashing Furnace Model OAF 11/2

Integrate maintenance plans directly into your work orders in MaintainX.

Solid-state Relay Replacement

Check mark

Preparation

Check mark

Disconnect the furnace from the supply

Check mark

Remove the furnace back panel

Check mark

Solid-state Relay Disconnection

Check mark

Make a note of how the wires are connected to the solid state relay

Check mark

Disconnect the wires from the solid state relay

Check mark

Solid-state Relay Removal

Check mark

Remove the solid state relay from the base panel or aluminium plate

Check mark

Solid-state Relay Replacement

Run this procedureArrow right

Door Plug Replacement

Check mark

Door Plug Removal

Check mark

Lift the furnace door to the open position

Check mark

Remove the door cover from the plug carrier assembly

Check mark

Slide the old door plug upwards out of its carrier

Check mark

New Door Plug Installation

Check mark

Slide the new plug into the carrier assembly ensuring it is the correct way up

Check mark

Refit the door cover

Check mark

Post Replacement Check

Check mark

Ensure that the ventilation is good when first heating the furnace after replacement

Run this procedureArrow right

Temperature Controller Replacement

Check mark

Preparation

Check mark

Wear an anti-static wrist strap

Check mark

Avoid any possibility of damage by static electricity

Check mark

Controller Removal

Check mark

Remove screws to separate controller from base

Check mark

Ease apart the two lugs at the side

Check mark

Grip the instrument and withdraw it from its sleeve

Check mark

Controller Installation

Check mark

Push in the replacement controller

Run this procedureArrow right

Fuse Replacement

Check mark

Preparation

Check mark

Consult circuit diagram (section 7.0) to identify fuse types.

Check mark

Refer to section 8.1 for the list of correct fuses.

Check mark

Inspection and Replacement

Check mark

Identify failed fuses

Check mark

Has any fuse failed?

Check mark

Consult an electrician to check internal circuits if any fuse has failed.

Check mark

Replace failed fuses with the correct type.

Check mark

Consult Carbolite before fitting larger capacity fuses for safety reasons.

Run this procedureArrow right

Power Adjustment

Check mark

Pre-Adjustment Checks

Check mark

Is the power limit parameter OP.Hi accessible to the operator?

Check mark

Is the current power limit set to zero for demonstration purposes?

Check mark

Power Adjustment

Check mark

Ensure the power limit is not set higher than the design level.

Check mark

Adjust the power limit to its standard value if it was set to zero.

Check mark

Post-Adjustment Verification

Check mark

Is the power limit set to 100% over all common voltages?

Check mark

Has the power limit been adjusted according to section 8.2 guidelines?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Carbolite Gero

Explore Other Assets