

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM10S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
16000 Hourly / 2 Yearly Delta Lube 06 Change
8.2.1 Maintenance schedule for normal operation
After every 16,000 op. hrs or every 2 years
Changing oil
Chapter 8.3.5 'Changing oil' on page 150
Replace Delta Lube 06
Follow the full oil draining and filling procedure as described in Initial 500 Hours Lube Oil Change
Initial 3 Hours Blower Check
Performing checks after commissioning — After the first 3 operating hours
Check that all components are in place and secure
Re-tighten screws if necessary after cooling down
Is the intake pressure valve operating correctly?
Enter the current oil level
Is the oil level correct?
Align the sheaves if necessary
Are the belts in good condition?
Change belts if necessary and establish cause of wear
16000 Hourly / 2 Yearly Non-Return Flap Inspection
Checking the non-return flap
Loosen the fastening screws and lightly impact the flange cover to loosen the sealing.
Remove the non-return flap from the housing.
Carry out a visual inspection of the non-return flap.
Is the sealing acceptable (no damage or hardening visible)?
Replace the non-return flap if damage or hardening is visible.
Assembling the non-return flap
Remove dirt, grease, and used sealing agent from the flange surface.
Apply sealing agent to the flange surface of the housing.
1 Weekly Belt Guard Inspection
8.2.1 Maintenance schedule for normal operation — Weekly
Check for damage and thorough stability
Remove dirt from the belt guard
Is the belt guard fastener tight?
Is there any lubricant bleeding out of the drive motor?
Remove any dirt from the outer belt guard
Is the belt guard sufficiently stable and undamaged?
16000 Hourly / 2 Yearly Flexible Pipe Connections Check
Maintenance schedule for normal operation
After every 16,000 op. hrs or every 2 years
Chapter 8.3.16 'Checking pipelines for tightness' on page 166
Personnel: Service personnel
Check flexible pipe connections for tightness
Check flexible pipe connections on the discharge and intake sides for tightness
Is replacement of flexible pipe connections necessary?
Checking intake-side pipelines for tightness
Check pipelines for tightness (visual inspection)
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













