Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Pump Flygt 3102.930
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 2 Month Zinc Anode Inspection
5.2 Estimate zinc anode replacement intervals
Remove, weigh, and reinstall one or more of the exterior zinc anodes before starting up the pump
After two months, remove and weigh the same zinc anode or anodes again
Enter the lapsed time in days between the initial and second weighing
Enter the anode weight loss in grams
Calculate the anode consumption rate (days/gram)
Calculate future replacement intervals based on the selected fraction of zinc remaining (recommended 0.25–0.50)
1 Yearly Zinc Anode Replacement
Estimate zinc anode replacement intervals
Measure the current anode consumption rate
Select the remaining fraction for replacement
Calculate the actual replacement interval
Is the calculated replacement interval less than 1 year?
If yes, schedule an earlier replacement
Initial 1 Year Pump Inspection
6.4 Service the pump
Check the pump condition
Recommend intervals for periodical inspection and overhaul
Was the inspection performed within the first year of operation?
Pump Maintenance
6.1 Precautions — Maintenance guidelines
Perform these tasks during maintenance and before reassembly
Ensure existing index markings are in line during reassembly
Insulation-test the reassembled drive unit
Test-run the reassembled pump before normal operation
Perform a ground (earth) continuity test after service
CLS Alarm Oil Housing Inspection
6.4.3 Service in case of alarm
Check for water in the oil housing
Does the oil contain too much water?
If the oil contains too much water
Drain the oil and water
Replace with new oil
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX