

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Pump Flygt 3102.910
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Pump Periodical Inspection
6.4 Service the pump
6.4.1 Inspection
Cable Inspection
Connection to power
Electrical cabinets
Impeller clearance
Adjust the impeller if necessary
Junction box
Lifting device
1 Yearly Zinc Anode Replacement
Estimate zinc anode replacement intervals
Measure the current anode consumption rate
Select the remaining fraction for calculation
Calculate the actual replacement interval based on measurements
Is the calculated replacement interval less than 1 year?
Adjust inspection and replacement schedule if necessary
1 Yearly Oil Change
6.3 Change the oil
Verify the oil type
Ensure the oil is medical white oil of paraffin type that fulfills FDA 172.878 (a) and viscosity close to VG32
Allow the chamber to de-pressurize before removal of the plug
Empty the oil
Place the pump in a horizontal position and unscrew the oil plug
Does the pump have a hole with the markings 'oil out'?
Place a container under the pump and turn the pump
Unscrew the other oil plug
CLS Alarm Oil Housing Inspection
Service in case of alarm
Check for water in the oil housing
Drain the oil and water if it contains too much water
Replace with new oil
Pump Maintenance
6.1 Precautions — Maintenance guidelines
Perform these tasks during maintenance and before reassembly
Ensure existing index markings are in line during reassembly
Insulation-test the reassembled drive unit
Test-run the reassembled pump before normal operation
Perform a ground (earth) continuity test after service
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













