MaintainX Asset Hub logo
EnterprisePricing
Xylem

Xylem Pump Flygt 3102.920

Need answers fast?
Explore the manual using AI.

Xylem Pump Flygt 3102.920
Xylem Pump Flygt 3102.920

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Xylem Pump Flygt 3102.920

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Xylem Pump Flygt 3102.920

Xylem Pump Flygt 3102.920

Create an account to install this asset package.

Maintenance Plans for Xylem Pump Model Flygt 3102.920

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Pump Periodical Inspection

Check mark

6.4 Service the pump

Check mark

6.4.1 Inspection

Check mark

Cable Inspection

Check mark

Check that the connections to power are properly secured

Check mark

Ensure electrical cabinets are clean and dry

Check mark

Check the impeller clearance and adjust if necessary

Check mark

Measure the resistance of the leakage sensor in the stator housing

Check mark

Check insulation resistance between ground and phase lead

Check mark

Conduct a phase-to-phase resistance check

Run this procedureArrow right

FLS Alarm Stator Housing Inspection

Check mark

Service in case of alarm

Check mark

Check for liquid in the stator housing

Check mark

Drain all liquid, if any

Check mark

Check the mechanical seal unit, the O-rings, and the cable entry, if liquid was found

Run this procedureArrow right

Pump Maintenance

Check mark

6.1 Precautions — Maintenance guidelines

Check mark

Perform these tasks during maintenance and before reassembly

Check mark

Ensure existing index markings are in line during reassembly

Check mark

Insulation-test the reassembled drive unit

Check mark

Test-run the reassembled pump before normal operation

Check mark

Perform a ground (earth) continuity test after service

Run this procedureArrow right

1 Yearly Zinc Anode Replacement

Check mark

5.2 Estimate zinc anode replacement intervals

Check mark

Record the current water temperature

Check mark

Measure the current mass of the zinc anodes

Check mark

Calculate the anode consumption rate

Check mark

Select the remaining fraction for replacement

Check mark

Calculate the actual replacement interval

Check mark

Is the calculated replacement interval less than 1 year?

Check mark

Describe any factors affecting the anode replacement interval

Run this procedureArrow right

3 Yearly Pump Overhaul

Check mark

6.4 Service the pump

Check mark

Check operating conditions

Check mark

Verify replacement of key components

Check mark

6.4.2 Overhaul

Check mark

Replace support and main bearings

Check mark

Replace mechanical seal units

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Xylem

Explore Other Assets