MaintainX Asset Hub logo
EnterprisePricing
United Metal Products

United Metal Products Evaporative Cooler UMP-824 S

Need answers fast?
Explore the manual using AI.

United Metal Products Evaporative Cooler UMP-824 S
United Metal Products Evaporative Cooler UMP-824 S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for United Metal Products Evaporative Cooler UMP-824 S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

United Metal Products Evaporative Cooler UMP-824 S

United Metal Products Evaporative Cooler UMP-824 S

Create an account to install this asset package.

Maintenance Plans for United Metal Products Evaporative Cooler Model UMP-824 S

Integrate maintenance plans directly into your work orders in MaintainX.

Water Pump and Reservoir Cleaning

Check mark

Safety Precautions

Check mark

Disconnect power before servicing pump

Check mark

Pump Cleaning

Check mark

Snap the plastic grid off the bottom of the pump

Check mark

Clean the plastic grid

Check mark

Reservoir Maintenance

Check mark

Remove old debris from the reservoir

Check mark

Coat painted galvanized steel reservoirs with high quality sub-sealer

Run this procedureArrow right

Pads and Filter Screen Replacement

Check mark

Pad Frame Removal

Check mark

Remove pad frame from cabinet by lifting from the bottom edge and pulling outward, then letting it drop.

Check mark

Old Pad and Filter Removal

Check mark

Remove wire retainer.

Check mark

Discard old pad(s) and filter.

Check mark

Pad Frame Cleaning

Check mark

Is it necessary to wash dirt and scale from pad frame with a mild detergent?

Check mark

Was the pad frame cleaned?

Check mark

New Pad Installation

Run this procedureArrow right

Belt Tension and Alignment Check

Check mark

Belt Tension Check

Check mark

Measure belt movement when pressed at mid-span

Check mark

Is the belt tension within the acceptable range?

Check mark

Is the new belt tighter than a used belt?

Check mark

Belt Alignment Check

Check mark

Ensure sheaves are aligned

Check mark

Is the belt straight when assembled?

Check mark

Final Inspection

Check mark

Was the belt tension adjusted correctly?

Run this procedureArrow right

4750 Hourly Motor Bearing Lubrication

Check mark

Preparation

Check mark

Ensure the following greases are available

Check mark

Lubrication Process

Check mark

Verify motor is turned off and locked out for safety

Check mark

Record the NEMA Frame size of the motor

Check mark

Is the NEMA Frame size between 210 to 280?

Check mark

Apply high grade ball bearing grease to the motor bearings

Check mark

Post-Lubrication Check

Check mark

Is the motor operating smoothly after lubrication?

Run this procedureArrow right

Fluted Evaporative Cooler Media Maintenance

Check mark

Initial Inspection

Check mark

Check pads for salt build-up

Check mark

Is there significant scale build-up on the pads?

Check mark

Cleaning Procedure

Check mark

Are the pads scaled and plugged?

Check mark

Hose down pads to clean away dirt and salt particles

Check mark

Replacement Procedure

Check mark

Are the pads too blocked, reducing cooling efficiency and air delivery?

Check mark

Remove outer access panels and internal media cover plate

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from United Metal Products

Explore Other Assets