PDF MANUAL

Manual for United Metal Products Evaporative Cooler UMP-824 D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

United Metal Products Evaporative Cooler UMP-824 D

United Metal Products Evaporative Cooler UMP-824 D

Create an account to install this asset package.

Maintenance Plans for United Metal Products Evaporative Cooler Model UMP-824 D

Integrate maintenance plans directly into your work orders in MaintainX.

Water Pump and Reservoir Cleaning

Check mark

Safety Precautions

Check mark

Disconnect power before servicing pump

Check mark

Pump Cleaning

Check mark

Snap the plastic grid off the bottom of the pump and clean

Check mark

Reservoir Maintenance

Check mark

Remove old debris from the reservoir

Check mark

Is the reservoir made of painted galvanized steel?

Check mark

Coat painted galvanized steel reservoirs with high quality sub-sealer if needed

Run this procedureArrow right

Initial 6 Months Bearing Lubrication

Check mark

Preparation

Check mark

Ensure the following items are available

Check mark

Ensure the fan is turned off and locked out for safety

Check mark

Lubrication Process

Check mark

Clean the grease fitting to prevent contamination

Check mark

Apply the recommended amount of grease

Check mark

Was the shaft rotated to aid corrosion protection?

Check mark

Post-Lubrication

Check mark

Wipe off any excess grease from the bearing housing

Run this procedureArrow right

Water Distributor Cleaning

Check mark

Initial Cleaning Steps

Check mark

Remove the distributor end cap

Check mark

Run the pump to clear contamination

Check mark

Advanced Cleaning Steps

Check mark

Was the contamination cleared with the pump?

Check mark

Use additional cleaning methods if necessary

Check mark

Manual Cleanout for Hybralume Units

Check mark

Remove the access panel and roof edge cover below the distributor

Check mark

Remove the inside hose from the end of the distributor pipe

Run this procedureArrow right

4750 Hourly Motor Bearing Lubrication

Check mark

Preparation

Check mark

Ensure you have the recommended grease

Check mark

Lubrication Process

Check mark

Clean the area around the grease fittings

Check mark

Enter the NEMA Frame size of the motor

Check mark

Is the NEMA Frame size between 210 and 280?

Check mark

Apply the grease to the motor bearings

Check mark

Post Lubrication

Check mark

Check for any grease leaks around the bearings

Run this procedureArrow right

Fluted Evaporative Cooler Media Maintenance

Check mark

Initial Inspection

Check mark

Check pads for salt build-up

Check mark

Is there significant scale build-up on the pads?

Check mark

Cleaning Procedure

Check mark

Are the pads scaled and plugged?

Check mark

Hose down pads to clean away dirt and salt particles

Check mark

Replacement Procedure

Check mark

Are the pads too blocked, reducing cooling efficiency and air delivery?

Check mark

Remove outer access panels and internal media cover plate

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.