Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

United Metal Products Evaporative Cooler UMP-751
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Belt Tension and Alignment Check
Belt Tension Check
Measure belt movement when pressed at mid-span
Is the belt tension within the acceptable range?
Is the new belt tighter than a used belt?
Belt Alignment Check
Ensure the following alignments
Are the sheaves aligned properly to keep the belt straight?
Post-Check Actions
Adjust belt tension if necessary
4750 Hourly Motor Bearing Lubrication
Preparation
Ensure you have the recommended grease
Lubrication Process
Clean the area around the grease fittings to prevent contamination.
Apply the correct amount of grease based on NEMA Frame size.
Is the grease applied evenly and without excess?
Post-Lubrication Check
Check for any grease leakage around the bearings.
Is the motor operating smoothly after lubrication?
Fluted Evaporative Cooler Media Maintenance
Initial Inspection
Check pads for salt build-up
Is there significant scale build-up on the pads?
Cleaning Procedure
Are the pads scaled and plugged?
Hose down pads to clean away dirt and salt particles
Replacement Procedure
Are the pads too blocked, reducing cooling efficiency and air delivery?
Remove outer access panels and internal media cover plate
Water Pump and Reservoir Cleaning
Safety Precautions
Disconnect power before servicing pump
Pump Cleaning
Snap the plastic grid off the bottom of the pump
Clean the plastic grid
Reservoir Maintenance
Remove old debris from the reservoir
Coat painted galvanized steel reservoirs with high quality sub-sealer
1 Yearly Cooler Maintenance
Annual Shut-Down
Turn off the water supply to the cooler
Unscrew and remove the standpipe to allow the water to drain down
Ensure no water is left standing in the unit for prolonged periods
Apply a coat of high quality sub-sealer to painted galvanized steel reservoirs
Gently hose stubborn deposits from the face of the evaporative media with fresh water
Run fresh water through the pump and water distribution system for 30 minutes
Ensure the fan/blower is turned off while flushing the system
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX