MaintainX Asset Hub logo
EnterprisePricing
United Metal Products

United Metal Products Evaporative Cooler UMP-739

Need answers fast?
Explore the manual using AI.

United Metal Products Evaporative Cooler UMP-739
United Metal Products Evaporative Cooler UMP-739

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for United Metal Products Evaporative Cooler UMP-739

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

United Metal Products Evaporative Cooler UMP-739

United Metal Products Evaporative Cooler UMP-739

Create an account to install this asset package.

Maintenance Plans for United Metal Products Evaporative Cooler Model UMP-739

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Cooler Maintenance

Check mark

Annual Shut-Down

Check mark

Turn off the water supply to the cooler

Check mark

Unscrew and remove the standpipe to allow the water to drain down

Check mark

Ensure no water is left standing in the unit for prolonged periods

Check mark

Apply a coat of high quality sub-sealer to painted galvanized steel reservoirs

Check mark

Gently hose stubborn deposits from the face of the evaporative media with fresh water

Check mark

Run fresh water through the pump and water distribution system for 30 minutes

Check mark

Ensure the fan/blower is turned off while flushing the system

Check mark

Confirm the reservoir is filled with water before operating the water pump

Run this procedureArrow right

Water Bleed-off System Maintenance

Check mark

Manual Bleed System Adjustment

Check mark

Measure the current pH level of the water

Check mark

Is the pH level within the normal range?

Check mark

Adjust the bleed-off flow rate

Check mark

Automatic Distributor Flush System Adjustment

Check mark

Adjust the timer for flush valve open duration

Check mark

Adjust the timer for flush cycle interval

Check mark

Flush Valve Maintenance

Check mark

Dismantle the flush valve

Run this procedureArrow right

Bearing Lubrication

Check mark

Preparation

Check mark

Ensure the fan is turned off and locked out before starting lubrication.

Check mark

Gather necessary tools and materials, including high quality NLGI No. 2 or 3 multipurpose ball bearing grease.

Check mark

Lubrication Process

Check mark

Inspect the bearing for any visible damage or wear.

Check mark

Select the type of grease to be used

Check mark

Apply the appropriate amount of grease (in grams)

Check mark

Rotate the shaft to distribute the grease evenly.

Check mark

Post-Lubrication

Run this procedureArrow right

Pads and Filter Screen Replacement

Check mark

Pad Frame Removal

Check mark

Remove pad frame from cabinet by lifting from the bottom edge and pulling outward, then letting it drop.

Check mark

Old Pad and Filter Removal

Check mark

Remove wire retainer.

Check mark

Discard old pad(s) and filter.

Check mark

Pad Frame Cleaning

Check mark

Is it necessary to wash dirt and scale from pad frame with a mild detergent?

Check mark

Was the pad frame cleaned?

Check mark

New Pad Installation

Run this procedureArrow right

Propeller Fan Assembly

Check mark

Safety Precautions

Check mark

Ensure guards are installed when the fan is operating above an occupied space or within 7ft of working area.

Check mark

Install guards whenever deemed advisable for safety reasons.

Check mark

Pre-Assembly Recommendations

Check mark

Install the sheave, pulley, and belt before setting the unit over the roof opening.

Check mark

Motor Installation

Check mark

Place the motor on the flat side of the adjustable motor base so that the drive belt will pass through the oblong cut out.

Check mark

Adjust motor base as required to assure proper belt tension.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from United Metal Products

Explore Other Assets