MaintainX Asset Hub logo
EnterprisePricing
United Metal Products

United Metal Products Evaporative Cooler UMP-644x2S

Need answers fast?
Explore the manual using AI.

United Metal Products Evaporative Cooler UMP-644x2S
United Metal Products Evaporative Cooler UMP-644x2S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for United Metal Products Evaporative Cooler UMP-644x2S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

United Metal Products Evaporative Cooler UMP-644x2S

United Metal Products Evaporative Cooler UMP-644x2S

Create an account to install this asset package.

Maintenance Plans for United Metal Products Evaporative Cooler Model UMP-644x2S

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 6 Months Bearing Lubrication

Check mark

Preparation

Check mark

Ensure the following items are available

Check mark

Ensure the fan is turned off and locked out for safety

Check mark

Lubrication Process

Check mark

Clean the grease fitting to prevent contamination

Check mark

Apply the recommended amount of grease

Check mark

Was the shaft rotated to aid corrosion protection?

Check mark

Post-Lubrication

Check mark

Wipe off any excess grease from the bearing housing

Run this procedureArrow right

Water Distributor Cleaning

Check mark

Preparation

Check mark

Remove the access panel and roof edge cover below the distributor.

Check mark

Remove the inside hose from the end of the distributor pipe and the pipe support that attaches to the cooler roof.

Check mark

Distributor Pipe Removal

Check mark

Remove both distributor end caps.

Check mark

Insert a 1/2" diameter x 6ft long rod or dowel into the distributor.

Check mark

Secure the end of the dowel at the end opposite to where the distributor will be removed.

Check mark

Rotate the distributor pipe down to break the seal and pull it horizontally out of the cooler.

Check mark

Cleaning

Run this procedureArrow right

4750 Hourly Motor Bearing Lubrication

Check mark

Preparation

Check mark

Ensure you have the correct type of grease

Check mark

Verify motor frame size is between 210 to 280

Check mark

Lubrication Process

Check mark

Clean the grease fittings before lubrication

Check mark

Apply the recommended amount of grease

Check mark

Is the grease application even and without excess?

Check mark

Post-Lubrication Check

Check mark

Inspect for any grease leaks

Run this procedureArrow right

1 Yearly Cooler Maintenance

Check mark

Annual Shut-Down

Check mark

Turn off the water supply to the cooler

Check mark

Unscrew and remove the standpipe to allow the water to drain down

Check mark

Ensure no water is left standing in the unit for prolonged periods

Check mark

Apply a coat of high quality sub-sealer to painted galvanized steel reservoirs

Check mark

Gently hose stubborn deposits from the face of the evaporative media with fresh water

Check mark

Run fresh water through the pump and water distribution system for 30 minutes

Check mark

Ensure the fan/blower is turned off while flushing the system

Run this procedureArrow right

Propeller Fan Assembly

Check mark

Safety Note

Check mark

Install the sheave, pulley, and belt before setting the unit over the roof opening

Check mark

Place the motor on the flat side of the adjustable motor base

Check mark

Adjust motor base to assure proper belt tension

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from United Metal Products

Explore Other Assets