

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

United Metal Products Evaporative Cooler UMP-739 XL
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
4750 Hourly Motor Bearing Lubrication
Preparation
Ensure the following greases are available
Lubrication Process
Verify motor is turned off and locked out for safety
Record the NEMA Frame size of the motor
Is the NEMA Frame size between 210 to 280?
Apply high grade ball bearing grease to the motor bearings
Post Lubrication
Was the lubrication process completed successfully?
Initial 6 Months Bearing Lubrication
Preparation
Ensure the following items are available
Ensure the fan is turned off and locked out for safety
Lubrication Process
Clean the grease fitting to prevent contamination
Apply the recommended amount of grease (in grams)
Was the shaft rotated after lubrication?
Post-Lubrication
Check for any signs of over greasing
Fluted Evaporative Cooler Media Maintenance
Initial Inspection
Check pads for salt build-up
Is there significant scale build-up on the pads?
Cleaning Procedure
Are the pads scaled and plugged?
Hose down pads to clean away dirt and salt particles
Replacement Procedure
Are the pads too blocked, reducing cooling efficiency and air delivery?
Remove outer access panels and internal media cover plate
1 Yearly Cooler Maintenance
Annual Shut-Down
Turn off the water supply to the cooler
Unscrew and remove the standpipe to allow the water to drain down
Ensure no water is left standing in the unit for prolonged periods
Reservoir Maintenance
Apply a coat of high quality sub-sealer to painted galvanized steel reservoirs
Evaporative Media Cleaning
Gently hose stubborn deposits from the face of the evaporative media with fresh water
Water System Flushing
Water Bleed-off System Maintenance
Manual Bleed System Maintenance
Measure the pH of the water
Is the pH of the water between 6 and 8?
Adjust the bleed-off flow rate while the pump is working
Discharge the bleed water directly into the overflow standpipe
Automatic Distributor Flush System Maintenance
Adjust the timer to increase/decrease the length of time the flush valve is open
Adjust the timer to change the period of time between flush cycles
Ensure the timer is wired in series with the pump
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













