Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

United Metal Products Evaporative Cooler UMP-724
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 6 Months Bearing Lubrication
Preparation
Ensure the following items are available
Ensure the fan is turned off and locked out for safety
Lubrication Process
Clean the grease fitting to prevent contamination
Apply the recommended amount of grease (in grams)
Rotate the shaft to distribute the grease evenly
Post-Lubrication
Was the lubrication completed without any issues?
Propeller Fan Assembly
Safety Note
Ensure guards are installed when the rotating fan prop or wheel is operating above an occupied space or within 7ft of working area or whenever deemed advisable for safety reasons.
Pre-assembly Installation
Install the sheave, pulley, and belt before setting the unit over the roof opening.
Motor Placement
Place the motor on the flat side of the adjustable motor base so that the drive belt will pass through the oblong cut out.
Motor Base Adjustment
Adjust motor base as required to assure proper belt tension.
Blower Fan Assembly
Safety Note
Guards must be installed when the rotating fan prop or wheel is operating above an occupied space or within 7ft of working area or whenever deemed advisable for safety reasons.
Place the motor on the adjustable motor base
Adjust motor to assure proper belt tension
Check motor location for belt alignment and adjustment
Water Distributor Cleaning
Preparation
Remove the access panel and roof edge cover below the distributor.
Remove the inside hose from the end of the distributor pipe and the pipe support that attaches to the cooler roof.
Distributor Pipe Removal
Remove both distributor end caps.
Insert a 1/2" diameter x 6ft long rod or dowel into the distributor.
Secure the end of the dowel at the end opposite to where the distributor will be removed.
Rotate the distributor pipe down to break the seal and pull it horizontally out of the cooler.
Cleaning
4750 Hourly Motor Bearing Lubrication
Preparation
Ensure you have the correct type of grease
Verify motor frame size is between 210 to 280
Lubrication Process
Clean the grease fittings before lubrication
Apply the recommended amount of grease
Check for any excess grease leakage after application
Post-Lubrication Check
Inspect the motor for unusual noises or vibrations
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX