

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

United Metal Products Evaporative Cooler UMP-730
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pads and Filter Screen Replacement
Pad Frame Removal
Remove pad frame from cabinet by lifting from the bottom edge and pulling outward, then letting it drop.
Old Pad and Filter Removal
Remove wire retainer.
Discard old pad(s) and filter.
Pad Frame Cleaning
Is it necessary to wash dirt and scale from pad frame with a mild detergent?
Wash dirt and scale from pad frame with a mild detergent if necessary.
New Pad Installation
4750 Hourly Motor Bearing Lubrication
Preparation
Ensure you have the recommended grease
Verify motor is off and locked out
Lubrication Process
Enter the NEMA Frame size of the motor
Is the NEMA Frame size between 210 and 280?
Clean the grease fittings
Apply the recommended amount of grease to the bearings
Post-Lubrication Check
Initial 6 Months Bearing Lubrication
Preparation
Ensure the following items are available
Ensure the fan is turned off and locked out for safety
Lubrication Process
Clean the grease fitting to prevent contamination
Apply the recommended amount of grease
Was the shaft rotated to aid corrosion protection?
Post-Lubrication
Wipe off any excess grease from the bearing housing
Bearing Lubrication
Preparation
Ensure the fan is turned off and locked out before starting lubrication.
Gather necessary tools and materials, including high quality NLGI No. 2 or 3 multipurpose ball bearing grease.
Lubrication Process
Inspect the bearing for any visible damage or wear.
Select the grease to be used
Apply grease to the bearing without over greasing.
Rotate the shaft to distribute the grease evenly.
Post-Lubrication
Belt Tension and Alignment Check
Belt Tension Check
Measure belt movement when pressed at mid-span
Is the belt tension within the acceptable range?
Belt Alignment Check
Ensure motor and fan sheave grooves are aligned
Is the belt alignment correct?
Post-Check Actions
Was the belt tension adjusted?
Was the belt alignment corrected?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













