MaintainX Asset Hub logo
EnterprisePricing
United Metal Products

United Metal Products Evaporative Cooler UMP-639x2S

Need answers fast?
Explore the manual using AI.

United Metal Products Evaporative Cooler UMP-639x2S
United Metal Products Evaporative Cooler UMP-639x2S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for United Metal Products Evaporative Cooler UMP-639x2S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

United Metal Products Evaporative Cooler UMP-639x2S

United Metal Products Evaporative Cooler UMP-639x2S

Create an account to install this asset package.

Maintenance Plans for United Metal Products Evaporative Cooler Model UMP-639x2S

Integrate maintenance plans directly into your work orders in MaintainX.

Belt Tension and Alignment Check

Check mark

Belt Tension Check

Check mark

Measure belt movement when pressed at mid-span

Check mark

Is the belt tension within the acceptable range?

Check mark

Is the new belt tighter than a used belt?

Check mark

Belt Alignment Check

Check mark

Check if the motor and fan sheave grooves are aligned

Check mark

Post-Check Actions

Check mark

Adjust belt tension if necessary

Check mark

Realign sheaves if necessary

Run this procedureArrow right

1 Yearly Cooler Maintenance

Check mark

Annual Shut-Down

Check mark

Turn off the water supply to the cooler

Check mark

Unscrew and remove the standpipe to allow the water to drain down

Check mark

Ensure no water is left standing in the unit for prolonged periods

Check mark

Apply a coat of high quality sub-sealer to painted galvanized steel reservoirs

Check mark

Gently hose stubborn deposits from the face of the evaporative media with fresh water

Check mark

Run fresh water through the pump and water distribution system for 30 minutes

Check mark

Ensure the fan/blower is turned off while flushing the system

Run this procedureArrow right

Blower Fan Assembly

Check mark

Safety Precautions

Check mark

Ensure guards are installed when the rotating fan prop or wheel is operating above an occupied space or within 7ft of working area.

Check mark

Is it advisable to install guards for safety reasons?

Check mark

Motor Installation

Check mark

Place the motor on the adjustable motor base - either pivot plate or manual slide rail.

Check mark

Adjust motor as required to assure proper belt tension.

Check mark

Describe any issues encountered during the assembly process

Run this procedureArrow right

4750 Hourly Motor Bearing Lubrication

Check mark

Preparation

Check mark

Ensure you have the correct type of grease

Check mark

Lubrication Process

Check mark

Verify motor is turned off and locked out for safety

Check mark

Record the NEMA Frame size of the motor

Check mark

Is the NEMA Frame size between 210 to 280?

Check mark

Apply grease to the motor bearings

Check mark

Post Lubrication

Check mark

Was the lubrication process completed successfully?

Run this procedureArrow right

Water Bleed-off System Maintenance

Check mark

Manual Bleed System Maintenance

Check mark

Measure the current pH level of the water

Check mark

Adjust the bleed-off flow rate

Check mark

Automatic Distributor Flush System Maintenance

Check mark

Adjust the timer for flush valve open duration

Check mark

Adjust the timer for flush cycle interval

Check mark

Flush Valve Maintenance

Check mark

Dismantle and clean the flush valve

Check mark

Post Maintenance Check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from United Metal Products

Explore Other Assets