MaintainX Asset Hub logo
EnterprisePricing
Trane

Trane Blower Coil Air Handler BCHE054BAA10A2

Need answers fast?
Explore the manual using AI.

Trane Blower Coil Air Handler BCHE054BAA10A2
Trane Blower Coil Air Handler BCHE054BAA10A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane Blower Coil Air Handler BCHE054BAA10A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane Blower Coil Air Handler BCHE054BAA10A2

Trane Blower Coil Air Handler BCHE054BAA10A2

Create an account to install this asset package.

Maintenance Plans for Trane Blower Coil Air Handler Model BCHE054BAA10A2

Integrate maintenance plans directly into your work orders in MaintainX.

Fan Motor Inspection

Check mark

Warning! Hazardous Voltage!

Check mark

Safety Precautions

Check mark

Disconnect all electric power, including remote disconnects before servicing.

Check mark

Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized.

Check mark

Verify that no power is present with a voltmeter.

Check mark

Fan Motor Inspection

Check mark

Inspect fan motors for excessive vibration.

Check mark

Inspect fan motors for excessive temperature.

Run this procedureArrow right

Sensor Cleaning

Check mark

NOTICE: Sensor Damage!

Check mark

Cleaning Instructions

Check mark

Apply glass cleaner to a soft, non-abrasive cloth

Check mark

Gently wipe the sensor face, including buttons and LCD display

Check mark

Use a premoistened towelette designed for lens or screen cleaning (optional)

Check mark

Precautions

Check mark

Ensure no solution is sprayed directly on the sensor

Check mark

Avoid pressing Occupied/Unoccupied buttons during cleaning

Run this procedureArrow right

5 Yearly Battery Replacement

Check mark

Safety Notices

Check mark

Battery Damage Warning

Check mark

Ensure not to recharge the batteries

Check mark

Ensure not to hook up the sensor to a power supply

Check mark

Sensor Damage Warning

Check mark

Use two non-rechargeable 1.5 V lithium AA batteries

Check mark

Use only UL-listed lithium batteries

Check mark

Battery Life Management

Check mark

If the sensor is not used for an extended period, choose an action

Run this procedureArrow right

3 Monthly Unit Check

Check mark

Safety Precautions

Check mark

Ensure all electrical power is disconnected, including remote disconnects.

Check mark

Discharge all energy storing devices such as capacitors.

Check mark

Follow proper lockout/tagout procedures.

Check mark

If working with live electrical components, ensure a qualified licensed electrician is present.

Check mark

Fan Wheel Inspection

Check mark

Manually rotate the fan wheel to check for obstructions in the housing or interference with fan blades.

Check mark

Remove any obstructions and debris from the fan wheel.

Check mark

Motor Bracket Check

Run this procedureArrow right

1 Weekly Unit Check

Check mark

Safety Warning

Check mark

Pre-Inspection Safety Check

Check mark

Ensure all electrical power is disconnected

Check mark

Discharge all energy storing devices such as capacitors

Check mark

Follow proper lockout/tagout procedures

Check mark

Unit Observation

Check mark

Observe unit for any change in running condition

Check mark

Listen for unusual noise

Run this procedureArrow right

Parts for Trane Blower Coil Air Handler BCHE054BAA10A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets